TEXAS · WELLS · KNOX COUNTY · API 42-275-31551 · DISTRICT 7C

South Taylor #1

Plugged

Knox County · Goree field  · Vertical

South Taylor #1 (API 42-275-31551) is a plugged well in Knox County, plugged April 5, 1991, last operated by Sullivan Hollis R. Inc..

The RRC has issued one drilling permit, issued April 24, 1984, permitted to 1,990 ft.

It was permitted by Sullivan, Hollis R. and has since transferred to Sullivan Hollis R. Inc. on the wellbore schedule.

Operator of record

Sullivan Hollis R. Inc.

Permitted by Sullivan, Hollis R.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSullivan, Hollis R.Apr 24, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,990
total depth, ft
1
permits on file
Apr 24, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 5, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
236597-99DrillSullivan, Hollis R.Apr 23, 1984Apr 24, 1984—1,990

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.26K
bbl, last 12 reported months
36.9K
bbl, all reported
Oct 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052537H-1 InjectionPlugged Apr 10, 1991001,780–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,255 · prior 12 13,470(-61%)

05001K1.5K19901991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27531551, documented in the API reference.