TEXAS · WELLS · KNOX COUNTY · API 42-275-31979 · DISTRICT 7B

Thorman F. W. #6

Shut in

Knox County · Valley View (Tannehill) field · Water Supply  · Vertical

Thorman F. W. #6 (API 42-275-31979) is a well in Knox County operated by Great American Resources Inc., completed March 19, 2004 and listed as water supply on the RRC schedule, shut in February 1, 2026.

The RRC has issued 2 drilling permits between 1991 and 2003, permitted to 5,300 ft.

It was permitted by Cholla Petroleum, Inc. and has since transferred to Great American Resources Inc. on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its 4 leases have reported 353K barrels of oil and 80 mcf of gas since January 1993, last reporting in July 2026. The leases carry 15 wells, so these are lease totals, not this well alone.

Operator of record

Great American Resources Inc.

Permitted by Cholla Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Bowie, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 23, 2026
Permits on file
8
Phone
(940) 894-2014

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGreat American Resources Inc.
Production reportsGreat American Resources Inc.through Apr 2026
Latest permitCholla Petroleum, Inc.Jun 11, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
2
permits on file
Jun 11, 2003
last permit issued
Mar 19, 2004
completed
353K
cumulative oil, bbl
80
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 19, 2004
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thorman, F. W. O-11-66949Valley View (Tannehill)Great American Resources Inc.7231K40Jan 1993 – Jul 2026
Thormann, F. W. O-13-4115Knox City, West (Strawn)Great American Resources Inc.8122K40Jan 1993 – Jul 2026
— O-13-27958——000—
— O-13-28175——000—

Oil, barrels lease total

Last 12 months 1,479 · prior 12 1,870(-21%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cholla Petroleum, Inc.Jan 1993 → May 2024
  2. 2Great American Resources Inc.Jun 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532890-99RecompletionCholla Petroleum, Inc.Jun 9, 2003Jun 11, 2003Mar 10, 20042,700
383396-99DrillCholla Petroleum, Inc.Jan 14, 1991Jan 16, 1991Jan 31, 19915,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 19, 2004Thorman F. W. O-11-66949Valley View (Tannehill)Great American Resources Inc.Water Supply · shut in Feb 1, 20265,300
Dec 23, 1991Thormann F. W. O-13-4115Knox City West (Strawn)Great American Resources Inc.Not on Schedule—
Mar 11, 1991Thorman F. W. O-13-27958R.P. (Strawn)Cholla Petroleum Inc.Not on Schedule—
Mar 11, 1991Thorman F. W. O-13-28175Knox City West (Strawn)Cholla Petroleum Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,517 ft elevation.Download CSV →

FormationMD ftSubsea
TannehillTANNEHILL SAND2,500-983

Perforations

Perforated and open-hole intervals.

FromToType
2,5042,508Perforated
2,6282,636Perforated
2,6402,646Perforated
2,6522,658Perforated
5,2225,226Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251267.875100 S
8.62512612.25100 S
5.55,2997.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 26, 2004Mar 25, 2004Yes
00Sep 14, 2004——
00Mar 24, 2000Feb 17, 2000Yes
00Jun 15, 1992May 26, 1992—
00May 14, 1992——
00Dec 13, 1991Mar 18, 1991Yes
00Apr 1, 1991Mar 18, 1991Yes
00Mar 27, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
220K
bbl, all reported
Feb 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077479H-1 InjectionCanceled Mar 14, 20005002,0005,216–5,250

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27531979, documented in the API reference.