TEXAS · WELLS · KNOX COUNTY · API 42-275-32139 · DISTRICT 09

Ratliff #1

Plugged

Knox County  · Vertical

Ratliff #1 (API 42-275-32139) is a plugged well in Knox County, plugged March 16, 2000, last operated by King Operating Corporation.

The RRC has issued one drilling permit (amended once), issued July 19, 1999, permitted to 6,500 ft.

Operator of record

King Operating Corporation

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Sep 30, 2025
Permits on file
180
Phone
(817) 865-3558

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitKing Operating CorporationJul 19, 1999
6,500
total depth, ft
2
permits on file
Jul 19, 1999
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 16, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
485996-98DrillKing Operating CorporationOct 18, 1999Jul 19, 1999Oct 28, 19996,500
485996-99DrillKing Operating CorporationJul 19, 1999Jul 19, 1999—5,900

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/27532139, documented in the API reference.