WELL · 42-283-30707 · DISTRICT 1
South Texas Syndicate -A- #1086
LA Salle County · Washburn Ranch (5500 Sd.) field · Vertical
South Texas Syndicate -A- #1086 (API 42-283-30707) is a plugged well in La Salle County, plugged November 4, 1997, last operated by Quintana Pet. Corp..
The RRC has issued 3 drilling permits between 1980 and 1988, permitted to 5,802 ft.
Completion filings report 3 formation tops, including Queen City, Carrizo, Wilcox.
Operator of record
- Based in
- Refugio, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 16, 2000
- Permits on file
- 1,589
- Phone
- (713) 651-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quintana Pet. Corp. |
| Production reports | Quintana Pet. Corp.through Apr 1995 |
| Latest permit | Quintana Pet. Corp.May 9, 1988 |
- 5,802
- total depth, ft
- 3
- permits on file
- May 9, 1988
- last permit issued
- Mar 27, 1982
- completed
- 0
- cumulative oil, bbl
- 73.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 27, 1982
- Shut in
- —
- Plugged
- Nov 4, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Texas Syndicate G-1-128855 | Washburn Ranch (4600) | Quintana Pet. Corp. | 1 | 0 | 73.2K | Jan 1993 – Nov 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quintana Pet. Corp.Jan 1993 → Apr 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 346178-99 | Recompletion | Quintana Pet. Corp. | May 6, 1988 | May 9, 1988 | — | 5,802 |
| 144142-99 | Recompletion | Quintana Pet. Corp. | Nov 24, 1981 | Nov 24, 1981 | — | 5,802 |
| 94091-99 | Drill | Cummins & Walker Oil Co., Inc. | Sep 29, 1980 | Sep 29, 1980 | — | 5,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-128855 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 441 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 1 | 440 |
| Carrizo | 3,170 | -2,729 |
| Wilcox | 4,500 | -4,059 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,626 | 4,632 | Perforated |
| 4,823 | 4,827 | Perforated |
| 5,524 | 5,543 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 509 | 13.75 | 445 S |
| 2.375 | 4,783 | — | — |
| 2.375 | 5,517 | — | — |
| 4.5 | 5,602 | 8.75 | 1,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 30, 1989 | Oct 28, 1988 | Yes |
| 00 | Jan 11, 1989 | — | — |
| 00 | Jan 12, 1984 | May 3, 1982 | — |
| 00 | Jan 12, 1984 | Nov 26, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-30707 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-30707 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28330707, documented in the API reference.