WELL · 42-283-31267 · DISTRICT 1

Caiman Ranch #1

Plugged

LA Salle County · Nunley Ranch (5890) field  · Vertical

Caiman Ranch #1 (API 42-283-31267) is a plugged well in La Salle County, plugged April 21, 1997, last operated by Mueller Engineering Corp..

The RRC has issued one drilling permit, issued July 26, 1989, permitted to 6,100 ft.

It was permitted by Kebo Oil & Gas, Inc. and has since transferred to Mueller Engineering Corp. on the wellbore schedule.

Completion filings report one formation top, including Carrizo.

Operator of record

Mueller Engineering Corp.

Permitted by Kebo Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Based in
Corpus Chrsti, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 13, 2001
Permits on file
236
Phone
(361) 883-1911

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMueller Engineering Corp.
Production reportsMueller Engineering Corp.through Feb 1996
Latest permitKebo Oil & Gas, Inc.Jul 26, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Jul 26, 1989
last permit issued
Oct 3, 1989
completed
0
cumulative oil, bbl
229K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 3, 1989
Shut in
—
Plugged
Apr 21, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caiman Ranch G-1-132334Nunley Ranch (5890)Mueller Engineering Corp.10229KJan 1993 – Apr 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enex Resources CorporationJan 1993 → Dec 1995
  2. 2Mueller Engineering Corp.Jan 1996 → Feb 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
361990-99DrillKebo Oil & Gas, Inc.Jul 26, 1989Jul 26, 1989Sep 9, 19896,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-132334————

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo3,404-3,044

Perforations

Perforated and open-hole intervals.

FromToType
5,8535,888Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62562312.25200 S
4.56,1077.8752,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 7, 1989Oct 12, 1989Yes
00Nov 21, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28331267, documented in the API reference.