WELL · 42-283-31447 · DISTRICT 1

Mobil Fee #6

Plugged

LA Salle County · Pearsall (Austin Chalk) field  · Horizontal

Mobil Fee #6 (API 42-283-31447) is a plugged horizontal well in La Salle County, plugged January 11, 1996, last operated by Oryx Energy Company.

The RRC has issued one drilling permit, issued July 2, 1991, permitted to 11,725 ft.

Completion filings report 4 formation tops, including Wilcox, San Miguel, 1st Lime, Anacacho.

Its 2 leases have reported 77.5K barrels of oil and 121K mcf of gas since January 1993, last reporting in August 1997. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Oryx Energy Company

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1998
Permits on file
1,627
Phone
(972) 715-4000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOryx Energy Company
Production reportsOryx Energy Companythrough Mar 1997
Latest permitOryx Energy CompanyJul 2, 1991
11,725
total depth, ft
1
permits on file
Jul 2, 1991
last permit issued
Aug 5, 1991
completed
77.5K
cumulative oil, bbl
121K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 5, 1991
Shut in
—
Plugged
Jan 11, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mobil Fee O-1-13098Pearsall (Austin Chalk)Oryx Energy Company677.5K121KJan 1993 – Aug 1997
Mobil Fee -B- O-1-13917Pearsall (Austin Chalk)McDaniel Company, Inc., The300Oct 1994 – Feb 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyJan 1993 → Mar 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
389563-99DrillOryx Energy CompanyJul 2, 1991Jul 2, 1991Jul 4, 199111,725

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13098————
—— O-1-13917————

Formation tops

As filed on W-2/G-1. Subsea from 564 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE WILCOX3,400-2,836
San Miguel5,661-5,097
1ST Lime6,260-5,696
Anacacho6,450-5,886

Perforations

Perforated and open-hole intervals.

FromToType
6,57511,381Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37575017.5640 S
9.6256,57512.25450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 1994Aug 29, 1991Yes
00Sep 26, 1991Aug 29, 1991Yes
00Sep 25, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28331447, documented in the API reference.