TEXAS · WELLS · LA SALLE COUNTY · THORNTON "H" LEASE · API 42-283-31766 · DISTRICT 01
Thornton H #1
La Salle County · Cooke (Edwards Lime) field · Temp Abandoned · Horizontal
Thornton H #1 (API 42-283-31766) is a horizontal well in La Salle County operated by Lewis Petro Properties Inc., completed December 2, 2002 and listed as temp abandoned on the RRC schedule, shut in March 1, 2021.
The RRC has issued one drilling permit (amended twice), issued September 20, 2002, permitted to 10,286 ft.
Completion filings report 3 formation tops, including Buda, Del Rio, Edwards.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- San Antonio, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 28, 2026
- Permits on file
- 3,007
- Phone
- (210) 384-3200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lewis Petro Properties Inc. |
| Production reports | Lewis Petro Properties, Inc.through Feb 2021 |
| Latest permit | Lewis Petro Properties, Inc.Sep 20, 2002 |
- 10,286
- total depth, ft
- 3
- permits on file
- Sep 20, 2002
- last permit issued
- Dec 2, 2002
- completed
- 0
- cumulative oil, bbl
- 657K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 2, 2002
- Shut in
- Mar 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thornton "H" G-1-193944 | Cooke (Edwards Lime) | Lewis Petro Properties, Inc. | 1 | 0 | 657K | Dec 2002 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lewis Petro Properties, Inc.Dec 2002 → Feb 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 523895-97 | Drill | Lewis Petro Properties, Inc. | Nov 13, 2002 | Sep 20, 2002 | — | 10,800 |
| 523895-98 | Drill | Lewis Petro Properties, Inc. | Sep 24, 2002 | Sep 20, 2002 | Oct 8, 2002 | 10,800 |
| 523895-99 | Drill | Lewis Petro Properties, Inc. | Sep 20, 2002 | Sep 20, 2002 | — | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 2, 2002 | Thornton H G-1-193944 | Cooke (Edwards Lime) | Lewis Petro Properties Inc. | Temp Abandoned · shut in Mar 1, 2021 | 10,286 |
Formation tops
As filed on W-2/G-1. Subsea from 387 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,378 | 11,849 | Perforated |
| 10,379 | 11,900 | Perforated |
| 10,469 | 12,731 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,510 | 12.25 | 470 S |
| 5.5 | 10,388 | 7.875 | 640 S |
| 5.5 | — | 7.875 | 685 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 2003 | Mar 20, 2003 | Yes |
| 00 | Apr 25, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-31766 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-31766 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28331766, documented in the API reference.