TEXAS · WELLS · LA SALLE COUNTY · API 42-283-31936 · DISTRICT 01
A. L. Krause Estate #9
La Salle County · Wildcat field · Vertical
- Fields on the latest permit · any of 6
- Atlee (Olmos) · Owen (Escondido) · Owen (Olmos) · Field 90606400 · Tom Walsh (Olmos) · Tom Walsh (Wilcox 4350)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
A. L. Krause Estate #9 (API 42-283-31936) is a plugged well in La Salle County, plugged April 29, 2006, last operated by Virtex Petroleum Company Inc..
The RRC has issued one drilling permit, issued March 21, 2006, permitted to 8,300 ft.
It was permitted by Virtex Petroleum Company, Inc. and has since transferred to Virtex Petroleum Company Inc. on the wellbore schedule.
Operator of record
Virtex Petroleum Company Inc.
Permitted by Virtex Petroleum Company, Inc.; the EWA schedule now lists a different operator.
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Virtex Petroleum Company, Inc.Mar 21, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,300
- total depth, ft
- 1
- permits on file
- Mar 21, 2006
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 29, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 616174-99 | Drill | Virtex Petroleum Company, Inc. | Mar 21, 2006 | Mar 21, 2006 | Apr 13, 2006 | 8,300 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-31936 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-31936 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28331936, documented in the API reference.