TEXAS · WELLS · LA SALLE COUNTY · API 42-283-32185 · DISTRICT 01
Devine-Nuts #1
La Salle County · Eagleville (Eagle Ford Sour) field · Horizontal
Devine-Nuts #1 (API 42-283-32185) is a plugged horizontal well in La Salle County, plugged May 15, 2018, last operated by Chesapeake Operating L.L.C..
The RRC has issued one drilling permit, issued January 28, 2009, permitted to 8,700 ft.
It was permitted by Stonegate Production Company,LLC and has since transferred to Chesapeake Operating L.L.C. on the wellbore schedule.
Completion filings report 7 formation tops, including Midway, Olmos, San Miguel, Anacacho.
Its 2 leases have reported 22.6K barrels of oil and 120K mcf of gas since March 2009, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Stonegate Production Company,llc; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Delinquent (D)
- P-5 last filed
- Sep 16, 2024
- Permits on file
- 1,645
- Phone
- (405) 935-3100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating L.L.C. |
| Production reports | Chesapeake Operating, L.L.C.through Apr 2018 |
| Latest permit | Stonegate Production Company,llcJan 28, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,700
- total depth, ft
- 1
- permits on file
- Jan 28, 2009
- last permit issued
- Apr 25, 2010
- completed
- 22.6K
- cumulative oil, bbl
- 120K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Apr 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 25, 2010
- Shut in
- —
- Plugged
- May 15, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Devine-Nuts O-1-15221 | Eagleville (Eagle Ford Sour) | Chesapeake Operating, L.L.C. | 1 | 22.6K | 120K | Apr 2010 – Apr 2018 |
| Devine-Nuts O-1-15125 | Wildcat | Chesapeake Operating, Inc. | 1 | 0 | 0 | Mar 2009 – — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Jul 2012 → Oct 2014
- 2Chesapeake Operating, L.L.C.Nov 2014 → Apr 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 677800-99 | Drill | Stonegate Production Company,llc | Jan 26, 2009 | Jan 28, 2009 | Mar 8, 2009 | 8,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 25, 2010 | Devine-Nuts O-1-15221 | Eagleville (Eagle Ford Sour) | Chesapeake Operating L.L.C. | Plugged | — |
| Mar 9, 2009 | Devine-Nuts O-1-15125 | Wildcat | Chesapeake Operating Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 20 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Midway | 3,423 | -3,403 |
| Olmos | 4,997 | -4,977 |
| San Miguel | 5,503 | -5,483 |
| Anacacho | 6,553 | -6,533 |
| Anacacho | 6,554 | -6,534 |
| Austin Chalk | 6,792 | -6,772 |
| Austin Chalk | 6,793 | -6,773 |
| Eagle Ford | 6,958 | -6,938 |
| Eagle FordEAGLEFORD | 7,283 | -7,263 |
| Buda | 7,489 | -7,469 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,431 | 10,300 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,722 | 12.25 | 1,235 S |
| 7 | 7,397 | 8.75 | 520 S |
| 7 | 73,797 | 8.75 | 520 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 19, 2011 | Feb 4, 2011 | — |
| 00 | Jan 7, 2011 | Aug 6, 2010 | — |
| 00 | Dec 1, 2010 | Sep 22, 2009 | Yes |
| 00 | Apr 23, 2010 | Sep 22, 2009 | Yes |
| 00 | Feb 19, 2010 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received Jun 13, 2012. Cased hole. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| SURVEYS CASED HOLESpans Eagle Ford, Buda | TIFF | 7,000 to 10,700 | Jun 13, 2012run Apr 24, 2009 | 0.80 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-32185 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-32185 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28332185, documented in the API reference.