TEXAS · WELLS · LA SALLE COUNTY · STS LEASE · API 42-283-32204 · DISTRICT 01
STS #3H
La Salle County · Hawkville (Eagleford Shale) field · Horizontal
Sts #3H (API 42-283-32204) is a plugged horizontal well in La Salle County, plugged April 30, 2025, last operated by Bpx Operating Company.
The RRC has issued one drilling permit, issued June 22, 2009, permitted to 17,000 ft.
It was permitted by Petrohawk Operating Company and has since transferred to Bpx Operating Company on the wellbore schedule.
Completion filings report 6 formation tops, including Escondido, Olmos, Anacacho, Austin Chalk.
Operator of record
Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 24, 2026
- Permits on file
- 1,576
- Phone
- (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BPX Operating Company |
| Production reports | BHP Billiton Pet(txla OP) Cothrough Sep 2014 |
| Latest permit | Petrohawk Operating CompanyJun 22, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 17,000
- total depth, ft
- 1
- permits on file
- Jun 22, 2009
- last permit issued
- Sep 16, 2009
- completed
- 0
- cumulative oil, bbl
- 1.1M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Sep 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 16, 2009
- Shut in
- —
- Plugged
- Apr 30, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| STS G-1-251818 | Hawkville (Eagleford Shale) | BPX Operating Company | 1 | 0 | 1.1M | Jul 2009 – Sep 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petrohawk Operating CompanySep 2009 → Jul 2013
- 2BHP Billiton Pet(txla OP) CoAug 2013 → Sep 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 682330-99 | Drill | Petrohawk Operating Company | Jun 19, 2009 | Jun 22, 2009 | Jun 23, 2009 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 16, 2009 | STS G-1-251818 | Hawkville (Eagleford Shale) | BPX Operating Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 474 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Escondido | 7,284 | -6,810 |
| Olmos | 9,184 | -8,710 |
| Anacacho | 11,256 | -10,782 |
| Austin Chalk | 11,424 | -10,950 |
| MFS Marker | 11,844 | -11,370 |
| Eagle FordEAGLEFORD | 11,897 | -11,423 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,185 | 11,756 | Perforated |
| 11,185 | 15,708 | Perforated |
| 11,793 | 12,972 | Perforated |
| 13,009 | 13,580 | Perforated |
| 13,617 | 15,708 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 4,150 | 14.75 | 2,100 S |
| 5.5 | 9,996 | 6.75 | 1,890 S |
| 4.5 | 15,812 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 2010 | Nov 16, 2009 | — |
| 00 | Dec 4, 2009 | Dec 10, 2009 | — |
| 00 | Dec 1, 2009 | Sep 14, 2009 | Yes |
| 00 | Oct 19, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-32204 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-32204 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28332204, documented in the API reference.