TEXAS · WELLS · LA SALLE COUNTY · HENDERSON-CENIZO LEASE · API 42-283-32212 · DISTRICT 01

Henderson-Cenizo #3H

Y

La Salle County · Hawkville (Eagleford Shale) field · Producing  · Horizontal

Henderson-Cenizo #3H (API 42-283-32212) is a horizontal well in La Salle County operated by Lewis Petro Properties Inc., completed April 1, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 10, 2009, permitted to 11,386 ft.

It was permitted by Petrohawk Operating Company and has since transferred to Lewis Petro Properties Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Olmos, Anachacho, Austin Chalk, Mfs Marker.

No lease production has been reported under this well’s leases.

Operator of record

Lewis Petro Properties Inc.

Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Jan 28, 2026
Permits on file
3,007
Phone
(210) 384-3200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLewis Petro Properties Inc.
Production reportsLewis Petro Properties, Inc.through Apr 2026
Latest permitPetrohawk Operating CompanyAug 10, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,386
total depth, ft
1
permits on file
Aug 10, 2009
last permit issued
Apr 1, 2024
completed
0
cumulative oil, bbl
4.16M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 1, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson-Cenizo G-1-255994Hawkville (Eagleford Shale)Lewis Petro Properties, Inc.104.16MOct 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 53,464 · prior 12 46,357(+15%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petrohawk Operating CompanyOct 2009 → Jul 2013
  2. 2BHP Billiton Pet(txla OP) CoAug 2013 → Jul 2019
  3. 3BPX Operating CompanyAug 2019 → Mar 2024
  4. 4Lewis Petro Properties, Inc.Apr 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
683870-99DrillPetrohawk Operating CompanyAug 6, 2009Aug 10, 2009Sep 6, 200917,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 2024Henderson-Cenizo G-1-255994Hawkville (Eagleford Shale)Lewis Petro Properties Inc.Producing11,386

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos7,919-7,541
Olmos7,920-7,542
Anachacho9,884-9,506
Austin Chalk10,107-9,729
Austin Chalk10,110-9,732
MFS Marker10,703-10,325
Eagle FordEAGLEFORD10,927-10,549
Eagle FordEAGLEFORD11,019-10,641
Buda11,181-10,803

Perforations

Perforated and open-hole intervals.

FromToType
11,44615,850Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,30014.752,345 S
5.510,0296.751,945 S
5.515,9476.751,945 S
4.515,947——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 6, 2024May 7, 2024—
00Jun 9, 2010Nov 24, 2009Yes
00Jun 2, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28332212, documented in the API reference.