WELL · 42-283-32213 · DISTRICT 1

Heim #1H

Plugged

LA Salle County · Hawkville (Eagleford Shale) field  · Horizontal

Heim #1H (API 42-283-32213) is a plugged horizontal well in La Salle County, plugged August 9, 2024, last operated by Bpx Operating Company.

The RRC has issued one drilling permit (amended once), issued August 12, 2009, permitted to 17,000 ft.

It was permitted by Petrohawk Operating Company and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 6 formation tops, including Olmos, Anacacho, Austin Chalk, Mfs Marker.

Operator of record

BPX Operating Company

Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsPetrohawk Operating Companythrough Jun 2012
Latest permitPetrohawk Operating CompanyAug 12, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
2
permits on file
Aug 12, 2009
last permit issued
Sep 5, 2009
completed
0
cumulative oil, bbl
402K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2009 THROUGH Sep 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 5, 2009
Shut in
—
Plugged
Aug 9, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heim G-1-253307WildcatBPX Operating Company10402KSep 2009 – Sep 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petrohawk Operating CompanyNov 2009 → Jun 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
683916-98DrillPetrohawk Operating CompanyAug 12, 2009Aug 12, 2009Aug 12, 200917,000
683916-99DrillPetrohawk Operating CompanyAug 6, 2009Aug 12, 2009Aug 12, 200917,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 5, 2009Heim G-1-253307Hawkville (Eagleford Shale)BPX Operating CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos7,919-7,541
Olmos7,920-7,542
Anacacho9,884-9,506
Austin Chalk10,109-9,731
Austin Chalk10,110-9,732
MFS Marker10,703-10,325
Eagle Ford10,923-10,545
Eagle Ford10,924-10,546
Eagle FordEAGLEFORD10,924-10,546
Buda11,181-10,803

Perforations

Perforated and open-hole intervals.

FromToType
14,31714,556Perforated
14,31715,610Perforated
14,58914,828Perforated
14,86115,100Perforated
15,13315,372Perforated
15,40515,610Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,23114.752,295 S
5.57,7626.751,515 S
4.515,7806.751,515 S
4.515,780——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 2021Jun 9, 2021—
00Apr 27, 2010Dec 11, 2009—
00Feb 19, 2010Nov 16, 2009Yes
00Dec 9, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28332213, documented in the API reference.