WELL · 42-283-32251 · DISTRICT 1

Nunley-Traylor #1H

Y

LA Salle County · Hawkville (Eagleford Shale) field · Producing  · Horizontal

Nunley-Traylor #1H (API 42-283-32251) is a horizontal well in La Salle County operated by Proline Energy Resources Inc, completed September 26, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 17, 2010, permitted to 14,000 ft.

It was permitted by El Paso E & P Company, L. P. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report 2 formation tops, including Eagle Ford, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Proline Energy Resources Inc

Permitted by EL Paso E & P Company, L. P.; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(832) 886-4420

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsProline Energy Resources Incthrough Apr 2026
Latest permitEL Paso E & P Company, L. P.Feb 17, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Feb 17, 2010
last permit issued
Sep 26, 2010
completed
0
cumulative oil, bbl
1.89M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 26, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nunley-Traylor G-1-258752Hawkville (Eagleford Shale)Proline Energy Resources Inc101.89MMay 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 32,665 · prior 12 33,636(-3%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso E & P Company, L. P.May 2010 → Jul 2012
  2. 2EP Energy E&P Company, L.P.Aug 2012 → Dec 2018
  3. 3Proline Energy Resources IncJan 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
691169-98DrillEL Paso E & P Company, L. P.Apr 21, 2010Feb 17, 2010Feb 24, 201014,000
691169-99DrillEL Paso E & P Company, L. P.Feb 11, 2010Feb 17, 2010Feb 24, 201014,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-258752————

Formation tops

As filed on W-2/G-1. Subsea from 380 ft elevation.Download CSV →

FormationMD ftSubsea
Eagle FordLOWER EAGLE FORD1,663-1,283
Austin Chalk11,594-11,214
Eagle Ford12,400-12,020
Austin Chalk——
Eagle Ford——
Eagle FordLOWER EAGLE FORD——

Perforations

Perforated and open-hole intervals.

FromToType
16,59916,602Perforated
16,63916,642Perforated
16,67916,682Perforated
16,71916,722Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1684——
10.754,21514.752,670 S
5.511,1009.8754,290 S
516,8389.8754,290 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 9, 2011Nov 5, 2010—
00Feb 10, 2011Jun 30, 2010Yes
00Feb 1, 2011——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28332251, documented in the API reference.