WELL · 42-283-32299 · DISTRICT 1

Hixon #5H

N

LA Salle County · Eagleville (Eagle Ford) field  · Horizontal

Hixon #5H (API 42-283-32299) is a horizontal well in La Salle County operated by El Paso E & P Company L. P., completed October 12, 2010.

The RRC has issued one drilling permit (amended once), issued June 23, 2010, permitted to 11,076 ft.

Completion filings report 8 formation tops, including Midway, Navarro, Olmos, Anacacho.

Its 2 leases have reported 948K barrels of oil and 1.53M mcf of gas since March 2010, last reporting in July 2026. The leases carry 28 wells, so these are lease totals, not this well alone.

Operator of record

EL Paso E & P Company L. P.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
May 8, 2012
Permits on file
582
Phone
(713) 420-7557

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso E & P Company L. P.
Production reportsVerdun Oil EF II LLCthrough Apr 2026
Latest permitEL Paso E & P Company, L. P.Jun 23, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,076
total depth, ft
2
permits on file
Jun 23, 2010
last permit issued
Oct 12, 2010
completed
948K
cumulative oil, bbl
1.53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 12, 2010
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 28 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hixon O-1-15312Eagleville (Eagle Ford-1)Verdun Oil EF II LLC22789K1.1MDec 2010 – Jul 2026
Hixon O-2-9438Eagleville (Eagle Ford)EL Paso E & P Company, L. P.6159K435KMar 2010 – Jun 2012

Oil, barrels lease total

Last 12 months 9,742 · prior 12 9,711(+0%)

01K2K202420252026

Gas, mcf lease total

Last 12 months 59,036 · prior 12 38,113(+55%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso E & P Company, L. P.Mar 2010 → Jul 2012
  2. 2EP Energy E&P Company, L.P.Aug 2012 → Apr 2022
  3. 3EP Energy E&P Company, LLCMay 2022 → Feb 2025
  4. 4Verdun Oil EF II LLCMar 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
697934-98DrillEL Paso E & P Company, L. P.Aug 9, 2010Jun 23, 2010Jul 5, 201011,076
697934-99DrillEL Paso E & P Company, L. P.Jun 22, 2010Jun 23, 2010Jul 5, 201011,076

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-15312————
—— O-2-9438————

Formation tops

As filed on W-2/G-1. Subsea from 353 ft elevation.Download CSV →

FormationMD ftSubsea
Midway5,239-4,886
Navarro6,104-5,751
Olmos7,388-7,035
Anacacho8,972-8,619
Austin Chalk9,664-9,311
Eagle FordEAGLEFORD9,755-9,402
Budda9,844-9,491
Annacacho——
Austin Chalk——
Eagle FordEAGLEFORD & BUDDA @ 9998' MD——
Midway——
Navarro——
Olmos——

Perforations

Perforated and open-hole intervals.

FromToType
13,12314,179Perforated
14,02114,024Perforated
14,06014,063Perforated
14,09914,102Perforated
14,13714,140Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2080——
10.753,44014.752,065 S
5.514,4038.752,615 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 2011May 3, 2011Yes
00Nov 9, 2011Nov 29, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.