WELL · 42-283-32335 · DISTRICT 1

Wareing #2H

N

LA Salle County · Eagleville (Eagle Ford) field  · Horizontal

Wareing #2H (API 42-283-32335) is a horizontal well in La Salle County operated by El Paso E & P Company L. P., completed November 1, 2010.

The RRC has issued one drilling permit (amended once), issued September 15, 2010, permitted to 9,000 ft.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its 2 leases have reported 6.62M barrels of oil and 9.12M mcf of gas since November 2010, last reporting in July 2026. The leases carry 32 wells, so these are lease totals, not this well alone.

Operator of record

EL Paso E & P Company L. P.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
May 8, 2012
Permits on file
582
Phone
(713) 420-7557

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso E & P Company L. P.
Production reportsVerdun Oil EF II LLCthrough Apr 2026
Latest permitEL Paso E & P Company, L. P.Sep 15, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Sep 15, 2010
last permit issued
Nov 1, 2010
completed
6.62M
cumulative oil, bbl
9.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 2010
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 32 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wareing O-1-15511Eagleville (Eagle Ford-1)Verdun Oil EF II LLC306.62M9.12MDec 2010 – Jul 2026
Wareing O-2-9623Eagleville (Eagle Ford)EL Paso E & P Company, L. P.200Nov 2010 – Mar 2012

Oil, barrels lease total

Last 12 months 119,781 · prior 12 128,318(-7%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 235,568 · prior 12 278,073(-15%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso E & P Company, L. P.Dec 2010 → Jul 2012
  2. 2EP Energy E&P Company, L.P.Aug 2012 → Apr 2022
  3. 3EP Energy E&P Company, LLCMay 2022 → Feb 2025
  4. 4Verdun Oil EF II LLCMar 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
701563-98DrillEL Paso E & P Company, L. P.Aug 3, 2011Sep 15, 2010Oct 17, 20109,000
701563-99DrillEL Paso E & P Company, L. P.Sep 1, 2010Sep 15, 2010Oct 17, 20109,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-15511————
—— O-2-9623————

Formation tops

As filed on W-2/G-1. Subsea from 556 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho7,920-7,364
Austin Chalk8,352-7,796
Eagle Ford8,782-8,226

Perforations

Perforated and open-hole intervals.

FromToType
9,13713,229Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
208020—
10.753,20614.751,905 S
5.513,5808.752,585 S
513,5808.752,585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 17, 2012Aug 3, 2011—
00Jan 13, 2012Mar 7, 2011Yes
00Nov 10, 2011Mar 7, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28332335, documented in the API reference.