TEXAS · WELLS · LA SALLE COUNTY · API 42-283-33259 · DISTRICT 01
WK Ace Unit 1 #1H
La Salle County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
WK Ace Unit 1 #1H (API 42-283-33259) is a horizontal well in La Salle County operated by Lewis Petro Properties Inc., completed August 24, 2012 and listed as producing on the RRC schedule, shut in November 1, 2024.
The RRC has issued one drilling permit (amended once), issued May 24, 2012, permitted to 10,096 ft.
It was permitted by Bhp Billiton Pet(Txla OP) CO and has since transferred to Lewis Petro Properties Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Olmos, Anacacho, Eagle Ford.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by BHP Billiton Pet(txla OP) Co; the EWA schedule now lists a different operator.
- Based in
- San Antonio, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 28, 2026
- Permits on file
- 3,007
- Phone
- (210) 384-3200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lewis Petro Properties Inc. |
| Production reports | Lewis Petro Properties, Inc.through Apr 2026 |
| Latest permit | Petrohawk Operating CompanyMay 24, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,096
- total depth, ft
- 2
- permits on file
- May 24, 2012
- last permit issued
- Aug 24, 2012
- completed
- 0
- cumulative oil, bbl
- 291K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 24, 2012
- Shut in
- Nov 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| WK Ace Unit 1 G-1-285731 | Eagleville (Eagle Ford-1) | Lewis Petro Properties, Inc. | 1 | 0 | 291K | Aug 2012 – Jul 2026 |
| WK Ace Unit 1 O-1-17075 | Eagleville (Eagle Ford-1) | BPX Operating Company | 1 | 0 | 0 | Aug 2012 – Dec 2019 |
| WK Ace Unit 1 G-1-267736 | Hawkville (Eagleford Shale) | Petrohawk Operating Company | 1 | 0 | 0 | Jun 2012 – Aug 2012 |
Gas, mcf lease total
Last 12 months 278 · prior 12 2,235(-88%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BPX Operating CompanyJun 2013 → Mar 2023
- 2BHP Billiton Pet(txla OP) CoJan 2017 → Jun 2019
- 3Lewis Petro Properties, Inc.Sep 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 740756-98 | Drill | BHP Billiton Pet(txla OP) Co | Oct 10, 2013 | May 24, 2012 | Jul 7, 2012 | 14,000 |
| 740756-99 | Drill | Petrohawk Operating Company | May 15, 2012 | May 24, 2012 | Jun 10, 2012 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 24, 2012 | WK Ace Unit 1 G-1-285731 | Eagleville (Eagle Ford-1) | Lewis Petro Properties Inc. | Producing · shut in Nov 1, 2024 | 10,096 |
| Aug 24, 2012 | WK Ace Unit 1 O-1-17075 | Eagleville (Eagle Ford-1) | BPX Operating Company | Not on Schedule | — |
| Jun 30, 2012 | WK Ace Unit 1 G-1-267736 | Hawkville (Eagleford Shale) | BHP Billiton Pet(txla OP) Co | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 414 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Olmos | 7,874 | -7,460 |
| Anacacho | 9,492 | -9,078 |
| Eagle FordEAGLEFORD SHALE | 10,080 | -9,666 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,506 | 14,957 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,215 | 12.25 | 1,270 S |
| 5.5 | 9,306 | 8.75 | 1,795 S |
| 4.5 | 15,020 | 6.75 | 1,795 S |
| 4.5 | 15,020 | 8.75 | 1,795 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 2019 | Oct 18, 2018 | Yes |
| 00 | Nov 25, 2013 | Oct 30, 2013 | Yes |
| 00 | May 17, 2013 | Aug 14, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-33259 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-33259 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28333259, documented in the API reference.