TEXAS · WELLS · LA SALLE COUNTY · LEDWIG KINSEY UNIT III LAS LEASE · API 42-283-33281 · DISTRICT 01

Ledwig Kinsey Unit III Las #B 2H

Y

La Salle County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Ledwig Kinsey Unit Iii Las #B 2H (API 42-283-33281) is a horizontal well in La Salle County operated by Ineos USA Oil & Gas LLC, completed August 11, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 1, 2012, permitted to 7,659 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Anacacho, Anacahco, Austin Chalk, Eagle Ford.

Its lease has reported 188K barrels of oil and 211K mcf of gas since March 2013, last reporting in July 2026.

Operator of record

Ineos USA Oil & Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
May 26, 2026
Permits on file
98
Phone
(720) 764-3473

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleIneos USA Oil & Gas LLC
Production reportsIneos USA Oil & Gas LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Jun 1, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,659
total depth, ft
2
permits on file
Jun 1, 2012
last permit issued
Aug 11, 2013
completed
188K
cumulative oil, bbl
211K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 11, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ledwig Kinsey Unit III Las O-1-16869Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLC1188K211KMar 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 3,404 · prior 12 4,452(-24%)

05001K202420252026

Gas, mcf lease total

Last 12 months 5,239 · prior 12 5,522(-5%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Sep 2013 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Mar 2023
  3. 3Ineos USA Oil & Gas LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
741427-98DrillChesapeake Operating, Inc.Feb 13, 2013Jun 1, 2012Mar 6, 20139,000
741427-99DrillChesapeake Operating, Inc.May 24, 2012Jun 1, 2012Mar 6, 20139,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 11, 2013Ledwig Kinsey Unit III Las O-1-16869Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLCProducing7,659

Formation tops

As filed on W-2/G-1. Subsea from 502 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho6,946-6,444
Anacahco6,946-6,444
Austin Chalk7,200-6,698
Eagle FordEAGLEFORD7,637-7,135

Perforations

Perforated and open-hole intervals.

FromToType
8,04013,799Perforated
13,52813,799Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,90812.25866 S
5.513,9848.751,979 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 9, 2013Nov 8, 2013—
00Jul 31, 2013Jun 10, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28333281, documented in the API reference.