TEXAS · WELLS · LA SALLE COUNTY · API 42-283-33438 · DISTRICT 01

Lowry Unit 2 #1H

Plugged

La Salle County · Eagleville (Eagle Ford-1) field  · Horizontal

Lowry Unit 2 #1H (API 42-283-33438) is a plugged horizontal well in La Salle County, plugged November 21, 2022, last operated by Bpx Operating Company.

The RRC has issued one drilling permit (amended once), issued August 13, 2012, permitted to 14,000 ft.

It was permitted by Petrohawk Operating Company and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 3 formation tops, including Olmos, Anacacho, Eagle Ford.

Operator of record

BPX Operating Company

Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBHP Billiton Pet(txla OP) Cothrough Feb 2018
Latest permitPetrohawk Operating CompanyAug 13, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Aug 13, 2012
last permit issued
Apr 18, 2013
completed
0
cumulative oil, bbl
1.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jan 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 18, 2013
Shut in
—
Plugged
Nov 21, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lowry Unit 2 G-1-271140Eagleville (Eagle Ford-1)BPX Operating Company101.58MApr 2013 – Jan 2023
Lowry Unit 2 G-1-270051Hawkville (Eagleford Shale)Petrohawk Operating Company100Nov 2012 – Jan 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BHP Billiton Pet(txla OP) CoApr 2013 → Feb 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745809-98DrillPetrohawk Operating CompanyApr 15, 2013Aug 13, 2012Dec 6, 201214,000
745809-99DrillPetrohawk Operating CompanyAug 3, 2012Aug 13, 2012Nov 12, 201214,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 18, 2013Lowry Unit 2 G-1-271140Eagleville (Eagle Ford-1)BPX Operating CompanyPlugged—
Nov 29, 2012Lowry Unit 2 G-1-270051Hawkville (Eagleford Shale)BHP Billiton Pet(txla OP) CoPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 294 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos8,188-7,894
Anacacho9,606-9,312
Eagle FordEAGLEFORD SHALE11,162-10,868

Perforations

Perforated and open-hole intervals.

FromToType
11,41116,457Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.52,9838.752,280 S
5.53,9838.752,280 S
9.6254,04412.251,160 S
4.516,6208.752,280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 22, 2014Nov 12, 2013Yes
00Oct 8, 2013Jan 21, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28333438, documented in the API reference.