TEXAS · WELLS · LA SALLE COUNTY · CRAWFORD RANCH A UNIT LEASE · API 42-283-33600 · DISTRICT 01

Crawford Ranch a Unit #11H

Y

La Salle County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Crawford Ranch A Unit #11H (API 42-283-33600) is a horizontal well in La Salle County operated by Texas American Resources Company, completed February 10, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 31, 2012, permitted to 7,569 ft.

It was permitted by Carrizo (Eagle Ford) LLC and has since transferred to Texas American Resources Company on the wellbore schedule.

Completion filings report 3 formation tops, including Carrizo, Austin Chalk, Eagle Ford.

Its lease has reported 247K barrels of oil and 646K mcf of gas since March 2013, last reporting in July 2026.

Operator of record

Texas American Resources Company

Permitted by Carrizo (Eagle Ford) LLC; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Dec 19, 2025
Permits on file
552
Phone
(512) 480-8700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas American Resources Company
Production reportsTexas American Resources Companythrough Apr 2026
Latest permitCarrizo (Eagle Ford) LLCOct 31, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,569
total depth, ft
2
permits on file
Oct 31, 2012
last permit issued
Feb 10, 2014
completed
247K
cumulative oil, bbl
646K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 10, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crawford Ranch a Unit O-1-16817Eagleville (Eagle Ford-1)Texas American Resources Company1247K646KMar 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 5,584 · prior 12 2,727(+105%)

05001K202420252026

Gas, mcf lease total

Last 12 months 20,965 · prior 12 4,774(+339%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Carrizo (Eagle Ford) LLCJun 2013 → Jan 2020
  2. 2Callon (Eagle Ford) LLCFeb 2020 → Oct 2021
  3. 3Texas American Resources CompanyNov 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
750577-98DrillCarrizo (Eagle Ford) LLCNov 9, 2012Oct 31, 2012Apr 26, 201311,000
750577-99DrillCarrizo (Eagle Ford) LLCOct 29, 2012Oct 31, 2012Nov 25, 201211,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 10, 2014Crawford Ranch a Unit O-1-16817Eagleville (Eagle Ford-1)Texas American Resources CompanyProducing7,569

Formation tops

As filed on W-2/G-1. Subsea from 520 ft elevation.Download CSV →

FormationMD ftSubsea
CarrizoBASE OF CARRIZO2,950-2,430
Austin Chalk7,016-6,496
Eagle Ford7,706-7,186

Perforations

Perforated and open-hole intervals.

FromToType
8,13016,840Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,05714.751,583 S
5.516,9638.753,077 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 24, 2014Mar 14, 2014Yes
00Sep 23, 2013Sep 6, 2013—
00Jul 11, 2013May 22, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28333600, documented in the API reference.