TEXAS · WELLS · LA SALLE COUNTY · API 42-283-33617 · DISTRICT 01

Jasik #41H

Shut in

La Salle County · Eagleville (Eagle Ford-1) field · Temp Abandoned  · Horizontal

Jasik #41H (API 42-283-33617) is a horizontal well in La Salle County operated by Javelin Energy Partners Mgmt LLC, completed December 7, 2013 and listed as temp abandoned on the RRC schedule, shut in June 1, 2020.

The RRC has issued one drilling permit, issued November 7, 2012, permitted to 7,635 ft.

It was permitted by Carrizo (Eagle Ford) LLC and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Carrizo, Austin Chalk, Eagle Ford.

Its 2 leases have reported 3.3M barrels of oil and 7.93M mcf of gas since January 2013, last reporting volume in March 2026. The leases carry 25 wells, so these are lease totals, not this well alone.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Carrizo (Eagle Ford) LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 24, 2026
Permits on file
234
Phone
(469) 575-3800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsJavelin Energy Partners Mgmt LLCthrough Mar 2026
Latest permitCarrizo (Eagle Ford) LLCNov 7, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,635
total depth, ft
1
permits on file
Nov 7, 2012
last permit issued
Dec 7, 2013
completed
3.3M
cumulative oil, bbl
7.93M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 7, 2013
Shut in
Jun 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jasik O-1-16622Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC243.14M7.57MJan 2013 – Mar 2026
Jasik G-1-291563Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC1159K358KDec 2013 – May 2020

Oil, barrels lease total

Last 12 months 27,125 · prior 12 23,514(+15%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 63,451 · prior 12 82,581(-23%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Carrizo (Eagle Ford) LLCOct 2013 → Jan 2020
  2. 2Callon (Eagle Ford) LLCDec 2013 → Jun 2023
  3. 3Ridgemar Energy Operating, LLCJul 2023 → Jan 2025
  4. 4Javelin Energy Partners Mgmt LLCFeb 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
751001-99DrillCarrizo (Eagle Ford) LLCNov 6, 2012Nov 7, 2012Jun 19, 201311,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 7, 2013Jasik G-1-291563Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLCTemp Abandoned · shut in Jun 1, 20207,635
Dec 7, 2013Jasik O-1-16622Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 474 ft elevation.Download CSV →

FormationMD ftSubsea
CarrizoBASE OF CARRIZO2,450-1,976
Austin Chalk6,844-6,370
Eagle Ford7,659-7,185

Perforations

Perforated and open-hole intervals.

FromToType
7,91512,176Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,57212.25651 S
5.512,2988.51,897 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 29, 2021Oct 18, 2021—
00Feb 3, 2014Jan 20, 2014Yes
00Oct 17, 2013Aug 20, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28333617, documented in the API reference.