TEXAS · WELLS · LA SALLE COUNTY · API 42-283-34285 · DISTRICT 01

JLH Lic D Unit #12H

Shut in

La Salle County · Eagleville (Eagle Ford-1) field · Temp Abandoned  · Horizontal

Jlh Lic D Unit #12H (API 42-283-34285) is a horizontal well in La Salle County operated by Javelin Energy Partners Mgmt LLC, completed February 10, 2014 and listed as temp abandoned on the RRC schedule, shut in December 1, 2018.

The RRC has issued one drilling permit (amended once), issued October 24, 2013, permitted to 8,254 ft.

It was permitted by Sanchez Oil & Gas Corporation and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.

Its 2 leases have reported 242K barrels of oil and 834K mcf of gas since October 2012, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by Sanchez Oil & Gas Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 24, 2026
Permits on file
233
Phone
(469) 575-3800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsJavelin Energy Partners Mgmt LLCthrough Mar 2026
Latest permitSanchez Oil & Gas CorporationOct 24, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,254
total depth, ft
2
permits on file
Oct 24, 2013
last permit issued
Feb 10, 2014
completed
242K
cumulative oil, bbl
834K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 10, 2014
Shut in
Dec 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
JLH Lic D Unit G-1-290939Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC1067.1KFeb 2014 – Jul 2026
JLH Lic D Unit O-1-16254Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC4242K767KOct 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 2,714 · prior 12 4,304(-37%)

05001K202420252026

Gas, mcf lease total

Last 12 months 2,983 · prior 12 5,956(-50%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sanchez Oil & Gas CorporationNov 2013 → Apr 2014
  2. 2Callon (Eagle Ford) LLCFeb 2014 → Jun 2023
  3. 3SN Operating, LLCMay 2014 → Nov 2016
  4. 4Carrizo (Eagle Ford) LLCDec 2016 → Jan 2020
  5. 5Ridgemar Energy Operating, LLCJul 2023 → Jan 2025
  6. 6Javelin Energy Partners Mgmt LLCFeb 2025 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
771845-98DrillSanchez Oil & Gas CorporationDec 11, 2013Oct 24, 2013Dec 6, 20139,100
771845-99DrillSanchez Oil & Gas CorporationOct 15, 2013Oct 24, 2013Dec 6, 20139,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 10, 2014JLH Lic D Unit G-1-290939Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLCTemp Abandoned · shut in Dec 1, 20188,254
Jun 5, 2014JLH Lic D Unit O-1-16254Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 467 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,220-6,753
Austin Chalk7,381-6,914
Eagle Ford8,077-7,610

Perforations

Perforated and open-hole intervals.

FromToType
8,55013,535Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,08112.251,035 S
5.513,6458.751,815 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 2021May 7, 2021—
00Mar 4, 2015Oct 22, 2014—
00May 20, 2014Apr 7, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28334285, documented in the API reference.