WELL · 42-283-34725 · DISTRICT 1
Storey Unit #1H
LA Salle County · Eagleville (Eagle Ford-1) field · Horizontal
Storey Unit #1H (API 42-283-34725) is a horizontal well in La Salle County operated by Eog Resources Inc., completed September 15, 2014.
The RRC has issued one drilling permit, issued May 2, 2014, permitted to 10,400 ft.
Completion filings report 11 formation tops, including Yegua, Sparta, Queen City, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,348
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Apr 2026 |
| Latest permit | EOG Resources, Inc.May 2, 2014 |
- 10,400
- total depth, ft
- 1
- permits on file
- May 2, 2014
- last permit issued
- Sep 15, 2014
- completed
- 0
- cumulative oil, bbl
- 942K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 2014
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Storey Unit G-1-298742 | Eagleville (Eagle Ford-1) | EOG Resources, Inc. | 1 | 0 | 942K | Sep 2014 – Jul 2026 |
| Storey Unit O-1-18010 | Eagleville (Eagle Ford-1) | EOG Resources, Inc. | 5 | 0 | 0 | Aug 2014 – Jun 2025 |
Gas, mcf lease total
Last 12 months 12,620 · prior 12 8,387(+50%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Sep 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 782873-99 | Drill | EOG Resources, Inc. | Mar 24, 2014 | May 2, 2014 | Jun 4, 2014 | 10,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-298742 | — | — | — | — |
| — | — O-1-18010 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 427 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 273 | 154 |
| Sparta | 933 | -506 |
| Queen City | 1,064 | -637 |
| WilcoxWILCOX - DISPOSAL | 2,253 | -1,826 |
| Escondido | 5,179 | -4,752 |
| OlmosOLMOS - DISPOSAL | 6,203 | -5,776 |
| Austin Chalk | 8,615 | -8,188 |
| Eagle FordEAGLE FORD - H2S | 8,785 | -8,358 |
| BudaBUDA - H2S | — | — |
| EdwardsEDWARDS - H2S | — | — |
| PearsallPEARSALL - H2S | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,253 | 16,017 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,634 | 12.25 | 1,170 S |
| 5.5 | 16,112 | 8.5 | 2,351 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 2025 | Jan 28, 2025 | — |
| 00 | Jan 12, 2015 | Oct 8, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-283-34725 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-283-34725 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28334725, documented in the API reference.