WELL · 42-283-34942 · DISTRICT 1

J Tyler Unit II Las #P 2H

Y

LA Salle County · Eagleville (Eagle Ford-1) field · Shut IN  · Horizontal

J Tyler Unit II Las #P 2H (API 42-283-34942) is a horizontal well in La Salle County operated by Ineos USA Oil & Gas LLC, completed February 21, 2015 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued July 19, 2014, permitted to 9,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Yegua, Queen City, Sparta, Wilcox.

Its lease has reported 1.12M barrels of oil and 959K mcf of gas since January 2013, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Ineos USA Oil & Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
May 26, 2026
Permits on file
98
Phone
(720) 764-3473

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleIneos USA Oil & Gas LLC
Production reportsIneos USA Oil & Gas LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Jul 19, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Jul 19, 2014
last permit issued
Feb 21, 2015
completed
1.12M
cumulative oil, bbl
959K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 21, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
J Tyler Unit II Las O-1-16786Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLC51.12M959KJan 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 8,877 · prior 12 19,544(-55%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 670 · prior 12 26,822(-98%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.May 2013 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Mar 2023
  3. 3Ineos USA Oil & Gas LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
789421-99DrillChesapeake Operating, Inc.Jun 12, 2014Jul 19, 2014Sep 18, 20149,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-16786————

Formation tops

As filed on W-2/G-1. Subsea from 543 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua920-377
Queen City2,350-1,807
Sparta2,350-1,807
WilcoxWILCOX - DISPOSAL3,660-3,117
Escondido4,957-4,414
OlmosOLMOS - DISPOSAL6,117-5,574
Austin Chalk8,009-7,466
Eagle FordEAGLE FORD - H2S8,422-7,879
BudaBUDA - H2S——
EdwardsEDWARDS - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
8,74414,071Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,27712.251,049 S
5.514,2457.8751,730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 7, 2015Mar 23, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28334942, documented in the API reference.