TEXAS · WELLS · LAVACA COUNTY · LEOPOLD, JOE LEASE · API 42-285-31359 · DISTRICT 02

Leopold Joe #1D

Plugged

Lavaca County · Hallettsville (10 150) field  · Vertical

Leopold Joe #1D (API 42-285-31359) is a plugged well in Lavaca County, plugged December 15, 2009, last operated by Cimarex Energy CO. Of Colorado.

The RRC has issued 2 drilling permits (amended once) between 1978 and 1979, permitted to 10,547 ft.

It was permitted by Howell Drilling, Inc. and has since transferred to Cimarex Energy CO. Of Colorado on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

Its lease has reported 2.56K barrels of oil and 36.4K mcf of gas since January 1993, last reporting in May 2012.

Operator of record

Cimarex Energy Co. of Colorado

Permitted by Howell Drilling, Inc.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 28, 2025
Permits on file
476
Phone
(432) 571-7800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCimarex Energy Co. of Colorado
Production reportsParker & Parsley Development L.Pthrough Jun 1996
Latest permitHowell Drilling, Inc.Nov 12, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,547
total depth, ft
3
permits on file
Nov 12, 1979
last permit issued
Jan 31, 1986
completed
2.56K
cumulative oil, bbl
36.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 31, 1986
Shut in
—
Plugged
Dec 15, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Leopold, Joe O-2-5916Hallettsville (10,150)Cimarex Energy Co. of Colorado12.56K36.4KJan 1993 – May 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Howell Drilling, Inc.Jan 1993 → Dec 1993
  2. 2Parker & Parsley Development Co.Jan 1994 → Feb 1995
  3. 3Parker & Parsley Development L.PMar 1995 → Jun 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
63507-98RecompletionHowell Drilling, Inc.Jul 23, 1987Nov 12, 1979—10,547
63507-99RecompletionHowell Drilling, Inc.Nov 12, 1979Nov 12, 1979—10,547
37036-99DrillHowell Drilling, Inc.Nov 16, 1978Nov 16, 1978Dec 17, 19789,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 31, 1986Leopold Joe O-2-5916Hallettsville (10 150)Cimarex Energy Co. of ColoradoPlugged—
Apr 12, 1979Leopold Gas Unit G-2-83154Hallettsville (7200)Howell Drilling Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 252 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaTOP OF YEGUA3,030-2,778
WilcoxTOP OF WILCOX5,700-5,448

Perforations

Perforated and open-hole intervals.

FromToType
7,1377,141Perforated
10,08110,096Perforated
10,10110,111Perforated
10,13610,146Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
51,0446.5335 S
10.751,69214.751,030 S
2.3757,120——
7.6259,2809.875740 S
7.6259,4809.875740 S
7.6259,5809.875740 S
2.37510,105——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 1986Feb 21, 1986Yes
00Jan 12, 1984May 21, 1980—
00Jan 12, 1984Jul 17, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28531359, documented in the API reference.