TEXAS · WELLS · LAVACA COUNTY · API 42-285-31377 · DISTRICT 02
McElroy #1
Lavaca County · Speaks (1900 W) field · Vertical
Mcelroy #1 (API 42-285-31377) is a plugged well in Lavaca County, plugged August 11, 1982, last operated by Kilroy Company Of Texas Inc..
The RRC has issued 3 drilling permits between 1979 and 1982, permitted to 10,500 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 26, 1991
- Permits on file
- 235
- Phone
- (713) 651-0101
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Kilroy Company of Texas, Inc.Aug 10, 1982 |
- 10,500
- total depth, ft
- 3
- permits on file
- Aug 10, 1982
- last permit issued
- Jun 14, 1982
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 14, 1982
- Shut in
- —
- Plugged
- Aug 11, 1982
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 168914-99 | Recompletion | Kilroy Company of Texas, Inc. | Aug 10, 1982 | Aug 10, 1982 | — | 9,010 |
| 153149-99 | Recompletion | Kilroy Company of Texas, Inc. | Mar 12, 1982 | Mar 12, 1982 | — | 9,790 |
| 42914-99 | Drill | Kilroy Company of Texas, Inc. | Feb 21, 1979 | Feb 21, 1979 | — | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 14, 1982 | McElroy G-2-102245 | Speaks (1900 W) | Kilroy Company of Texas Inc. | Plugged | — |
| Jul 2, 1979 | McElroy G-2-84412 | Speaks SW. (10 000) | Kilroy Company of Texas Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,900 | 1,908 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 14 | 47 | 14 | — |
| 9.625 | 1,599 | 12.25 | 51 S |
| 2.375 | 1,876 | — | — |
| 2.875 | 10,128 | — | — |
| 5.5 | 10,491 | 8.75 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 16, 1979 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-31377 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-31377 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28531377, documented in the API reference.