WELL · 42-285-31766 · DISTRICT 2

E. P. C. Gas Unit #1

N

Lavaca County · Allen Ranch (14 800) field  · Vertical

E. P. C. Gas Unit #1 (API 42-285-31766) is a well in Lavaca County operated by Tex/Con Oil & Gas Company, completed April 21, 1988.

The RRC has issued 2 drilling permits between 1983 and 1990, permitted to 17,000 ft.

Completion filings report 4 formation tops, including Yegua, Top Of Cook Mtn, Wilcox, Top Of E Sand.

No lease production has been reported under this well’s leases.

Operator of record

Tex/Con Oil & Gas Company

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Oct 7, 1992
Permits on file
79
Phone
(713) 272-5082

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTex/Con Oil & Gas Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitTex/Con Oil & Gas CompanyMar 22, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
2
permits on file
Mar 22, 1990
last permit issued
Apr 21, 1988
completed
0
cumulative oil, bbl
6.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 21, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Baber G-2-135076Provident City (Wilcox 9970)Hilcorp Energy Company106.06MJan 1993 – Jul 2026
— G-2-110993——000—

Gas, mcf lease total

Last 12 months 55,553 · prior 12 53,257(+4%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pg&e Resources CompanyJan 1993 → Oct 1994
  2. 2Dalen Resources Oil & Gas Co.Nov 1994 → Dec 1995
  3. 3Enserch Exploration, IncJan 1996 → Mar 1998
  4. 4Eex CorporationApr 1998 → Feb 2000
  5. 5Eex Operating, L.P.Mar 2000 → Apr 2000
  6. 6Eex E&P Company, L.P.May 2000 → Jul 2003
  7. 7Newfield Exploration CompanyAug 2003 → Sep 2016
  8. 8Hilcorp Energy CompanyOct 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
371303-99RecompletionTex/Con Oil & Gas CompanyMar 22, 1990Mar 22, 1990—16,000
218204-99DrillBass Enterprises Production Co.Oct 20, 1983Oct 20, 1983Dec 12, 198317,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-110993————
—— G-2-135076————

Formation tops

As filed on W-2/G-1. Subsea from 152 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaTOP OF YEGUA5,700-5,548
Yegua5,700-5,548
Top of Cook MTN6,230-6,078
WilcoxTOP OF WILCOX9,084-8,932
WilcoxTOP WILCOX9,084-8,932
Wilcox9,084-8,932
Top of E Sand10,140-9,988
WilcoxTOP WILCOX E10,140-9,988
WilcoxWILCOX E SAND10,140-9,988

Perforations

Perforated and open-hole intervals.

FromToType
9,9399,959Perforated
9,9789,986Perforated
9,99810,005Perforated
10,00010,010Perforated
10,09910,106Perforated
14,82714,847Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2010130—
13.3752,94817.5—
13.3752,98417.51,775 sx
13.3752,98417.25—
9.62510,41212.25—
5.514,9586.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 2023Oct 11, 2023—
00Aug 3, 1990Jun 5, 1990Yes
00Jul 7, 1990——
00Jun 10, 1988May 5, 1988—
00Jul 2, 1984May 15, 1984—
00Jun 27, 1984May 15, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28531766, documented in the API reference.