WELL · 42-285-31794 · DISTRICT 2

Robertson F #5

Plugged

Lavaca County · Speaks SW. (5570) field  · Vertical

Robertson F #5 (API 42-285-31794) is a plugged well in Lavaca County, plugged October 17, 2003, last operated by Txo Production Corp..

The RRC has issued 5 drilling permits between 1984 and 1993, permitted to 6,100 ft.

It was permitted by Bridge Oil Production CO., Inc. and has since transferred to Txo Production Corp. on the wellbore schedule.

Completion filings report 2 formation tops, including Frio, Yegua.

Operator of record

TXO Production Corp.

Permitted by Bridge Oil Production Co., Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 1, 1992 · 3,227 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsCostilla Petroleum Corporationthrough May 1996
Latest permitBridge Oil Production Co., Inc.Mar 16, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
5
permits on file
Mar 16, 1993
last permit issued
Jan 31, 1984
completed
0
cumulative oil, bbl
15.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 31, 1984
Shut in
—
Plugged
Oct 17, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robertson "F" G-2-145032Speaks, S.W. (3120)Dominion Oklahoma Texas E&P, Inc1013.8KMar 1993 – Oct 2003
Robertson "F" G-2-139242Speaks, SW. (Yegua 5200)Valley Gathering Company101.41KJan 1993 – Sep 1995
— G-2-126683——000—
— G-2-135004——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Oct 1993
  3. 3Costilla Petroleum CorporationApr 1996 → May 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
409897-99RecompletionBridge Oil Production Co., Inc.Mar 15, 1993Mar 16, 1993Mar 3, 19935,200
390321-99RecompletionBridge Oil Production Co., Inc.Jul 29, 1991Jul 31, 1991Jul 16, 19916,100
370512-99RecompletionTXO Production Corp.Mar 5, 1990Mar 6, 1990—6,100
341189-99RecompletionTXO Production Corp.Jan 8, 1988Jan 14, 1988—6,100
226055-99DrillTXO Production Corp.Jan 6, 1984Jan 9, 1984—6,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-126683————
—— G-2-135004————
—— G-2-139242————
—— G-2-145032————

Formation tops

As filed on W-2/G-1. Subsea from 169 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,430-2,261
FrioTOP OF FRIO2,430-2,261
YeguaTOP OF YEGUA5,240-5,071
Yegua5,240-5,071

Perforations

Perforated and open-hole intervals.

FromToType
3,1153,117Perforated
5,2365,246Perforated
5,2885,292Perforated
5,3785,385Perforated
5,4315,435Perforated
5,5705,576Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,07812.25407 S
2.8755,7507.8751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 1993Mar 19, 1993Yes
00May 10, 1993——
00Oct 10, 1991Aug 2, 1991—
00Sep 16, 1991——
00Aug 10, 1990May 11, 1990Yes
00Jul 11, 1990——
00Apr 6, 1988Feb 12, 1988Yes
00Mar 30, 1988——
00Mar 23, 1984Feb 7, 1984—
00Mar 13, 1984Feb 7, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28531794, documented in the API reference.