WELL · 42-285-32058 · DISTRICT 2
Traylor Alma V. #2
Lavaca County · Provident City (Yegua L-2) field · Vertical
Traylor Alma V. #2 (API 42-285-32058) is a plugged well in Lavaca County, plugged March 25, 2024, last operated by Shana Petroleum Company.
The RRC has issued 3 drilling permits between 1989 and 1998, permitted to 6,500 ft.
Completion filings report 3 formation tops, including Frio, Vicksburg, Yegua.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 2, 2001
- Permits on file
- 208
- Phone
- (214) 692-9211
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shana Petroleum Company |
| Production reports | Shana Petroleum Companythrough Nov 1998 |
| Latest permit | Shana Petroleum CompanyJul 22, 1998 |
- 6,500
- total depth, ft
- 3
- permits on file
- Jul 22, 1998
- last permit issued
- Dec 14, 1989
- completed
- 0
- cumulative oil, bbl
- 192K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 14, 1989
- Shut in
- —
- Plugged
- Mar 25, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Traylor, Alma V. G-2-170653 | Provident City (Frio 3100) | TMR Exploration, Inc. | 1 | 0 | 1.53K | Aug 1998 – Mar 2024 |
| Traylor, Alma V. G-2-134986 | Provident City (Yegua K, West) | Shana Petroleum Company | 1 | 0 | 190K | Jan 1993 – Jun 1999 |
| — G-2-133216 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shana Petroleum CompanyJan 1993 → Nov 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 477719-99 | Recompletion | Shana Petroleum Company | Jul 6, 1998 | Jul 22, 1998 | Aug 7, 1998 | 5,485 |
| 370575-99 | Recompletion | Shana Petroleum Company | Mar 5, 1990 | Mar 5, 1990 | — | 5,526 |
| 365946-99 | Drill | Shana Petroleum Company | Nov 2, 1989 | Nov 2, 1989 | Nov 11, 1989 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-133216 | — | — | — | — |
| — | — G-2-134986 | — | — | — | — |
| — | — G-2-170653 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 165 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,062 | 3,065 | Perforated |
| 5,462 | 5,465 | Perforated |
| 5,625 | 5,632 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,487 | 12.25 | 490 S |
| 4.5 | 5,804 | 7.875 | 623 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 1999 | Aug 28, 1998 | Yes |
| 00 | Nov 10, 1998 | — | — |
| 00 | Sep 10, 1990 | Mar 28, 1990 | Yes |
| 00 | Aug 3, 1990 | — | — |
| 00 | Mar 12, 1990 | Jan 5, 1990 | Yes |
| 00 | Feb 22, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-32058 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-32058 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28532058, documented in the API reference.