TEXAS · WELLS · LAVACA COUNTY · BRUSHY CREEK LEASE · API 42-285-32408 · DISTRICT 02

Brushy Creek #1

Shut in

Lavaca County · Dry Hollow (Wilcox Massive East) field · Temp Abandoned  · Vertical

Brushy Creek #1 (API 42-285-32408) is a well in Lavaca County operated by Proline Energy Resources Inc, completed January 12, 1999 and listed as temp abandoned on the RRC schedule, shut in December 1, 2002.

The RRC has issued 2 drilling permits (amended once) between 1996 and 1999, permitted to 15,330 ft.

It was permitted by Dale Operating Company and has since transferred to Proline Energy Resources Inc on the wellbore schedule.

Completion filings report one formation top, including Rochelle.

No lease production has been reported under this well’s leases.

Operator of record

Proline Energy Resources Inc

Permitted by Dale Operating Company; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(832) 886-4420

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProline Energy Resources Inc
Production reportsProline Energy Resources Incthrough Nov 2019
Latest permitDale Operating CompanyJun 30, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,330
total depth, ft
3
permits on file
Jun 30, 1999
last permit issued
Jan 12, 1999
completed
0
cumulative oil, bbl
1.57M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 12, 1999
Shut in
Dec 1, 2002
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brushy Creek G-2-162212Dry Hollow (Wilcox Massive East)Proline Energy Resources Inc101.57MJan 1997 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dale Operating CompanyJan 1997 → Feb 2000
  2. 2Wynn-Crosby Energy, Inc.Mar 2000 → Nov 2002
  3. 3Proline Energy Resources IncOct 2019 → Nov 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
485565-99Field transferDale Operating CompanyJun 30, 1999Jun 30, 1999Jan 12, 199915,500
453602-98DrillDale Operating CompanyMar 12, 1997Oct 8, 1996—15,500
453602-99DrillDale Operating CompanyOct 8, 1996Oct 8, 1996Oct 14, 199615,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 12, 1999Brushy Creek G-2-162212Dry Hollow (Wilcox Massive East)Proline Energy Resources IncTemp Abandoned · shut in Dec 1, 200215,330
Jan 12, 1999Brushy Creek G-2-162212Dry Hollow (Wilcox Massive East)Proline Energy Resources IncTemp Abandoned · shut in Dec 1, 200215,330

Formation tops

As filed on W-2/G-1. Subsea from 154 ft elevation.Download CSV →

FormationMD ftSubsea
Rochelle14,100-13,946

Perforations

Perforated and open-hole intervals.

FromToType
14,10014,120Perforated
14,13014,155Perforated
14,17614,188Perforated
14,21014,220Perforated
14,23814,256Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,51417.51,620 S
9.62510,17012.251,115 S
5.511,8296.5295 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2000Jul 9, 1999—
00Apr 24, 1997Feb 19, 1997Yes
00Apr 2, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28532408, documented in the API reference.