WELL · 42-285-32486 · DISTRICT 2
Miller #1
Lavaca County · Hope NE. (2900) field · Vertical
Miller #1 (API 42-285-32486) is a plugged well in Lavaca County, plugged March 7, 2014, last operated by Nordstrand Engineering Inc..
The RRC has issued one drilling permit (amended twice), issued May 16, 1997, permitted to 3,700 ft.
It was permitted by Tamarack Petroleum Company, Inc. and has since transferred to Nordstrand Engineering Inc. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by Tamarack Petroleum Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 3, 2025
- Permits on file
- 7
- Phone
- (713) 520-1555
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Nordstrand Engineering Inc. |
| Production reports | Nordstrand Engineering, Inc.through Aug 2011 |
| Latest permit | Tamarack Petroleum Company, Inc.May 16, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 3
- permits on file
- May 16, 1997
- last permit issued
- Aug 19, 1997
- completed
- 0
- cumulative oil, bbl
- 315K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Mar 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 19, 1997
- Shut in
- —
- Plugged
- Mar 7, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Miller G-2-166123 | Hope, NE. (2900) | Nordstrand Engineering, Inc. | 1 | 0 | 315K | Aug 1997 – Mar 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tamarack Petroleum Company, Inc.Aug 1997 → May 2010
- 2Nordstrand Engineering, Inc.Jun 2010 → Aug 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 462018-96 | Drill | Tamarack Petroleum Company, Inc. | Nov 26, 1997 | May 16, 1997 | Jul 4, 1997 | 3,700 |
| 462018-98 | Drill | Tamarack Petroleum Company, Inc. | Jul 2, 1997 | May 16, 1997 | — | 3,700 |
| 462018-99 | Drill | Tamarack Petroleum Company, Inc. | May 6, 1997 | May 16, 1997 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-166123 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 136 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 2,945 | -2,809 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,945 | 2,951 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 411 | 12.25 | 170 S |
| 2.875 | 3,223 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 2, 1998 | Oct 2, 1997 | Yes |
| 00 | Jan 30, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-32486 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-32486 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28532486, documented in the API reference.