WELL · 42-285-32682 · DISTRICT 2
D. Bohot Unit #1
Lavaca County · Joseph P. Mueller (Jules Y-3) field · Vertical
D. Bohot Unit #1 (API 42-285-32682) is a plugged well in Lavaca County, plugged June 16, 2002, last operated by Mueller Exploration Inc..
The RRC has issued one drilling permit, issued February 15, 1999, permitted to 5,200 ft.
Completion filings report one formation top, including Yegua.
Its 2 leases have reported 16.9K barrels of oil and 97.3K mcf of gas since March 1999, last reporting in June 2007. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Humble, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 15, 2025
- Permits on file
- 95
- Phone
- (361) 882-7888
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mueller Exploration Inc. |
| Production reports | Mueller Exploration, Inc.through Jul 2000 |
| Latest permit | Mueller Exploration, Inc.Feb 15, 1999 |
- 5,200
- total depth, ft
- 1
- permits on file
- Feb 15, 1999
- last permit issued
- Mar 23, 1999
- completed
- 16.9K
- cumulative oil, bbl
- 97.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jun 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 23, 1999
- Shut in
- —
- Plugged
- Jun 16, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| D. Bohot Unit O-2-8454 | Joseph P. Mueller (Jules Y-3) | Mueller Exploration, Inc. | 1 | 16.9K | 7.93K | Mar 1999 – Jun 2007 |
| D. Bohot Gas Unit G-2-176815 | Joseph P. Mueller (Jules Y-3) | Mueller Exploration, Inc. | 1 | 0 | 89.3K | Feb 2000 – Jun 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mueller Exploration, Inc.May 1999 → Jul 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 482490-99 | Drill | Mueller Exploration, Inc. | Feb 5, 1999 | Feb 15, 1999 | Mar 6, 1999 | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-176815 | — | — | — | — |
| — | — O-2-8454 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 4,050 | -3,838 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,571 | 4,575 | Perforated |
| 4,584 | 4,588 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 558 | 12.25 | 260 S |
| 2.875 | 5,150 | 2.875 | 1,057 S |
| 2.875 | 5,150 | 7.875 | 1,057 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 2000 | Mar 30, 2000 | Yes |
| 00 | Jul 17, 2000 | Mar 30, 2000 | Yes |
| 00 | May 12, 2000 | — | — |
| 00 | Oct 12, 1999 | Jul 15, 1999 | Yes |
| 00 | Aug 31, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-32682 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-32682 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28532682, documented in the API reference.