TEXAS · WELLS · LAVACA COUNTY · API 42-285-32897 · DISTRICT 02

Jacobs Ranch #1

Plugged

Lavaca County · Lavaca River (1700) field  · Vertical

Fields on the latest permit · any of 10
Borchers (2100) · Field 10634420 · Hope (Miocene 1000) · Hope (Miocene 2500) · Lavaca River (1700) · Lavaca River (2100) · Lavaca River (2110) · Lavaca River (2630) · Lavaca River (2800) · Speaks (2200)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Jacobs Ranch #1 (API 42-285-32897) is a plugged well in Lavaca County, plugged May 28, 2003, last operated by Garrison Ltd.

The RRC has issued one drilling permit, issued May 25, 2001, permitted to 2,800 ft.

It was permitted by Garrison Ltd and has since transferred to Garrison Ltd on the wellbore schedule.

Operator of record

Garrison Ltd

Permitted by Garrison Ltd; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitGarrison LtdMay 25, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,800
total depth, ft
1
permits on file
May 25, 2001
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 28, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
509433-99DrillGarrison LtdMay 25, 2001May 25, 2001Jun 7, 20012,800

Well logs

1 log loaded from the RRC's log index, the latest received Oct 4, 2006. Resistivity, Sonic. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Combination: Resistivity/Acoustic PorosityDUAL INDUCTION FOCUSED COMPENSATED DENSILOG CTIFF269 to 2,795Oct 4, 2006run Jun 12, 2001—

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28532897, documented in the API reference.