TEXAS · WELLS · LAVACA COUNTY · API 42-285-33045 · DISTRICT 02

Freeman #10

Plugged

Lavaca County · Speaks ( 9400 Wilcox) field  · Vertical

Freeman #10 (API 42-285-33045) is a plugged well in Lavaca County, plugged February 6, 2012, last operated by Xto Energy Inc..

The RRC has issued 3 drilling permits (amended once) between 2003 and 2009, permitted to 17,100 ft.

Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Jun 2010
Latest permitXTO Energy Inc.Sep 14, 2009
17,100
total depth, ft
4
permits on file
Sep 14, 2009
last permit issued
Dec 10, 2009
completed
0
cumulative oil, bbl
2.51M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2003 THROUGH Feb 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 10, 2009
Shut in
—
Plugged
Feb 6, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Freeman G-2-228251Esperanza (Wilcox Sibley A)XTO Energy Inc.100Jul 2006 – Feb 2012
Freeman G-2-255327Speaks ( 9400 Wilcox)XTO Energy Inc.103.12KOct 2009 – Feb 2012
Freeman G-2-200576Crandall Rubie (L. Sibley Sand)XTO Energy Inc.102.5MDec 2003 – Oct 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dominion Oklahoma Texas E&P, IncJan 2004 → Jul 2007
  2. 2XTO Energy Inc.Aug 2007 → Jun 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
684888-98RecompletionXTO Energy Inc.Dec 2, 2009Sep 14, 2009Oct 1, 200916,098
684888-99RecompletionXTO Energy Inc.Sep 9, 2009Sep 14, 2009—16,098
622553-99RecompletionDominion Oklahoma Texas E&P, IncJul 13, 2006Jul 19, 2006Jun 7, 200616,098
538149-99DrillDominion Oklahoma Texas E&P, IncNov 3, 2003Nov 3, 2003Nov 12, 200317,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 10, 2009Freeman G-2-255327Speaks ( 9400 Wilcox)XTO Energy Inc.Plugged—
Jul 29, 2006Freeman G-2-228251Esperanza (Wilcox Sibley A)XTO Energy Inc.Plugged—
Jul 29, 2006Freeman G-2-200576Crandall Rubie (L. Sibley Sand)XTO Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 166 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,640-2,474
Yegua5,130-4,964
Wilcox8,194-8,028

Perforations

Perforated and open-hole intervals.

FromToType
9,1229,132Perforated
9,3509,358Perforated
14,78414,795Perforated
14,81014,826Perforated
15,06615,094Perforated
15,09915,103Perforated
15,52015,550Perforated
15,56215,570Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,00117.51,270 S
9.62510,60412.25525 S
3.516,0728.51,670 S
3.516,0988.51,670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 19, 2012Oct 28, 2011—
00Sep 2, 2010Feb 22, 2010Yes
00Apr 15, 2010——
00Oct 2, 2007Sep 24, 2007—
00Sep 26, 2007Jun 14, 2007—
00Jul 27, 2007Jun 14, 2007—
00Jul 23, 2007——
00Jul 15, 2005Mar 15, 2004—
00Jul 14, 2005Jan 29, 2004Yes
00Apr 28, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28533045, documented in the API reference.