WELL · 42-285-33096 · DISTRICT 2
Sibley Estate #1
Lavaca County · Esperanza (12000 Sand) field · Vertical
Sibley Estate #1 (API 42-285-33096) is a plugged well in Lavaca County, plugged December 1, 2011, last operated by EP Energy E&P Company L.P..
The RRC has issued one drilling permit (amended once), issued August 4, 2004, permitted to 20,000 ft.
It was permitted by El Paso Production Oil & Gas CO. and has since transferred to EP Energy E&P Company L.P. on the wellbore schedule.
Completion filings report one formation top, including Wilcox.
Operator of record
Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 30, 2024
- Permits on file
- 1,518
- Phone
- (713) 997-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EP Energy E&P Company L.P. |
| Production reports | EL Paso E & P Company, L. P.through Aug 2006 |
| Latest permit | EL Paso Production Oil & Gas Co.Aug 30, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 20,000
- total depth, ft
- 2
- permits on file
- Aug 30, 2004
- last permit issued
- Dec 21, 2005
- completed
- 0
- cumulative oil, bbl
- 420K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Nov 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 21, 2005
- Shut in
- —
- Plugged
- Dec 1, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sibley Estate G-2-213432 | Esperanza (12000 Sand) | EL Paso E & P Company, L. P. | 1 | 0 | 420K | Dec 2004 – Nov 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production Oil & Gas Co.Dec 2004 → Jul 2006
- 2EL Paso E & P Company, L. P.Aug 2006 → Aug 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 549049-98 | Drill | EL Paso Production Oil & Gas Co. | Aug 26, 2004 | Aug 30, 2004 | Aug 30, 2004 | 20,000 |
| 549049-99 | Drill | EL Paso Production Oil & Gas Co. | Aug 2, 2004 | Aug 4, 2004 | — | 20,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-213432 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 191 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,049 | 12,053 | Perforated |
| 12,049 | 12,367 | Perforated |
| 12,355 | 12,367 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,525 | 17.5 | 1,990 S |
| 9.625 | 9,775 | 12.25 | 1,470 S |
| 5 | 16,610 | 6.75 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 2006 | Feb 6, 2006 | — |
| 00 | Apr 27, 2006 | Jun 10, 2005 | Yes |
| 00 | Jan 26, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33096 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33096 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533096, documented in the API reference.