TEXAS · WELLS · LAVACA COUNTY · NEW-HENDERSON UNIT LEASE · API 42-285-33139 · DISTRICT 02
New-Henderson Unit #1
Lavaca County · Mont (Wilcox 10640) field · Vertical
New-Henderson Unit #1 (API 42-285-33139) is a plugged well in Lavaca County, plugged March 29, 2021, last operated by Trio Consulting & Management LLC.
The RRC has issued one drilling permit (amended twice), issued March 22, 2005, permitted to 12,000 ft.
Completion filings report 3 formation tops, including Yequa, Wilcox, Midcox.
Operator of record
Trio Consulting & Management LLC
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 23, 2025
- Permits on file
- 351
- Phone
- (940) 767-2847
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trio Consulting & Management LLC |
| Production reports | Trio Consulting & Management,llcthrough Sep 2020 |
| Latest permit | Trio Consulting & Management,llcMar 22, 2005 |
- 12,000
- total depth, ft
- 3
- permits on file
- Mar 22, 2005
- last permit issued
- Oct 13, 2005
- completed
- 0
- cumulative oil, bbl
- 791K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2005 THROUGH Mar 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 13, 2005
- Shut in
- —
- Plugged
- Mar 29, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| New-Henderson Unit G-2-216104 | Mont (Wilcox 10640) | Trio Consulting & Management,llc | 1 | 0 | 791K | Oct 2005 – Mar 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trio Consulting & Management,llcOct 2005 → Sep 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 559335-97 | Drill | Trio Consulting & Management,llc | Dec 1, 2005 | Mar 22, 2005 | Apr 15, 2005 | 12,000 |
| 559335-98 | Drill | Trio Consulting & Management,llc | Sep 26, 2005 | Mar 22, 2005 | Apr 15, 2005 | 12,000 |
| 559335-99 | Drill | Trio Consulting & Management,llc | Mar 22, 2005 | Mar 22, 2005 | Apr 15, 2005 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 13, 2005 | New-Henderson Unit G-2-216104 | Mont (Wilcox 10640) | Trio Consulting & Management LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 262 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,734 | 10,834 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,044 | 14.75 | 1,197 S |
| 7.625 | 9,942 | 9.875 | 375 S |
| 4.5 | 11,840 | 6.75 | 645 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2006 | Nov 7, 2005 | Yes |
| 00 | May 31, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33139 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33139 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533139, documented in the API reference.