TEXAS · WELLS · LAVACA COUNTY · API 42-285-33171 · DISTRICT 02
Chicolete Creek #1
Lavaca County · Borchers East (1250) field · Producing · Vertical
Chicolete Creek #1 (API 42-285-33171) is a well in Lavaca County operated by Magnum Producing LP, completed June 11, 2009 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2005 and 2009, permitted to 4,200 ft.
Completion filings report one formation top, including Catahoula.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 26, 2026
- Permits on file
- 312
- Phone
- (361) 882-3858
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Magnum Producing LP |
| Production reports | Magnum Producing, LPthrough Mar 2026 |
| Latest permit | Magnum Producing, LPJul 7, 2009 |
- 4,200
- total depth, ft
- 2
- permits on file
- Jul 7, 2009
- last permit issued
- Jun 11, 2009
- completed
- 0
- cumulative oil, bbl
- 1.26M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 11, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chicolete Creek G-2-250887 | Borchers, East (1250) | Magnum Producing, LP | 1 | 0 | 956K | Jun 2009 – Jul 2026 |
| Chicolete Creek G-2-219885 | Kemper, East (3120) | Magnum Producing, LP | 1 | 0 | 309K | Feb 2006 – Jun 2009 |
Gas, mcf lease total
Last 12 months 100,809 · prior 12 95,826(+5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magnum Producing, LPMay 2006 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 682504-99 | Recompletion | Magnum Producing, LP | Jun 25, 2009 | Jul 7, 2009 | Jun 10, 2009 | 3,500 |
| 602547-99 | Drill | Magnum Producing, LP | Jun 24, 2005 | Jun 24, 2005 | Aug 1, 2005 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 11, 2009 | Chicolete Creek G-2-250887 | Borchers East (1250) | Magnum Producing LP | Producing | 4,200 |
| Mar 8, 2006 | Chicolete Creek G-2-219885 | Kemper East (3120) | Magnum Producing LP | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 149 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,290 | 1,294 | Perforated |
| 3,126 | 3,133 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 413 | 12.25 | 175 S |
| 4.5 | 3,437 | 7.875 | 995 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 11, 2010 | Jul 14, 2009 | Yes |
| 00 | Sep 16, 2009 | — | — |
| 00 | Feb 16, 2007 | Mar 10, 2006 | Yes |
| 00 | Oct 6, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33171 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33171 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533171, documented in the API reference.