WELL · 42-285-33365 · DISTRICT 2
Provident City G.U. #15
Lavaca County · Provident City NE (LWR Wx. Cons) field · Vertical
Provident City G.U. #15 (API 42-285-33365) is a well in Lavaca County operated by Newfield Exploration Company, completed March 16, 2007.
The RRC has issued 2 drilling permits between 2007 and 2010, permitted to 17,000 ft.
Completion filings report 8 formation tops, including Wilcox, L Wilcox 4, Lwr Wilcox 4, L Wilcox 8.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- The Woodlands, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Sep 2, 2022
- Permits on file
- 821
- Phone
- (281) 210-5100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Newfield Exploration Company |
| Production reports | Hilcorp Energy Companythrough Jan 2025 |
| Latest permit | Newfield Exploration CompanyMay 26, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 17,000
- total depth, ft
- 2
- permits on file
- May 26, 2010
- last permit issued
- Mar 16, 2007
- completed
- 0
- cumulative oil, bbl
- 1.13M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 16, 2007
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Provident City G.U. G-2-256520 | Provident City (Wilcox 11,900) | Hilcorp Energy Company | 1 | 0 | 196K | May 2010 – Jul 2026 |
| Provident City G.U. G-2-227402 | Provident City NE (LWR Wx. Cons) | Newfield Exploration Company | 1 | 0 | 937K | Mar 2007 – Jun 2016 |
Gas, mcf lease total
Last 12 months 0 · prior 12 722(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Newfield Exploration CompanyMar 2007 → Dec 2013
- 2Hilcorp Energy CompanyNov 2018 → Jan 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 696567-99 | Recompletion | Newfield Exploration Company | May 25, 2010 | May 26, 2010 | Apr 27, 2010 | 13,000 |
| 632298-99 | Drill | Newfield Exploration Company | Jan 22, 2007 | Jan 24, 2007 | Feb 4, 2007 | 17,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-227402 | — | — | — | — |
| — | — G-2-256520 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 164 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxTOP WILCOX | 8,456 | -8,292 |
| L Wilcox 4 | 11,456 | -11,292 |
| LWR Wilcox 4 | 11,456 | -11,292 |
| L Wilcox 8 | 12,076 | -11,912 |
| LWR Wilcox 8 | 12,076 | -11,912 |
| L Wilcox 10 | 12,323 | -12,159 |
| L Wilcox 11 | 12,509 | -12,345 |
| L Wilcox 13 | 12,692 | -12,528 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,802 | 11,810 | Perforated |
| 11,934 | 11,940 | Perforated |
| 12,100 | 12,115 | Perforated |
| 12,714 | 12,748 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,537 | 17.5 | 1,909 S |
| 9.875 | 10,600 | 12.25 | 655 S |
| 3.5 | 12,863 | 8.5 | 1,097 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 2019 | Jan 24, 2019 | — |
| 00 | Aug 18, 2010 | May 27, 2010 | Yes |
| 00 | Jul 13, 2010 | — | — |
| 00 | Jun 29, 2007 | Apr 25, 2007 | Yes |
| 00 | Jun 26, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33365 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33365 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533365, documented in the API reference.