WELL · 42-285-33968 · DISTRICT 2
Haase #1
Lavaca County · Word (Wilcox Lower) field · Vertical
Haase #1 (API 42-285-33968) is a well in Lavaca County operated by Trio Consulting & Management LLC, completed October 2, 2015.
The RRC has issued one drilling permit, issued July 17, 2015, permitted to 9,800 ft.
Completion filings report 7 formation tops, including Catahoula, Frio, Yegua, Wilcox.
Its 3 leases have reported 19.3K barrels of oil and 383K mcf of gas since October 2015, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Trio Consulting & Management LLC
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 23, 2025
- Permits on file
- 351
- Phone
- (940) 767-2847
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trio Consulting & Management LLC |
| Production reports | Trio Consulting & Management,llcthrough Apr 2026 |
| Latest permit | Trio Consulting & Management,llcJul 17, 2015 |
- 9,800
- total depth, ft
- 1
- permits on file
- Jul 17, 2015
- last permit issued
- Oct 2, 2015
- completed
- 19.3K
- cumulative oil, bbl
- 383K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 2, 2015
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haase O-2-11845 | Word (Wilcox, Lower) | Trio Consulting & Management,llc | 1 | 12.2K | 0 | Jan 2018 – Jul 2026 |
| Haase G-2-281195 | Word (Wilcox, Lower) | Trio Consulting & Management,llc | 1 | 0 | 364K | May 2016 – Jan 2022 |
| Haase O-2-11181 | Word (Wilcox, Lower) | Trio Consulting & Management,llc | 1 | 7.07K | 18.3K | Oct 2015 – Jan 2017 |
Oil, barrels lease total
Last 12 months 958 · prior 12 1,202(-20%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trio Consulting & Management,llcOct 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 808296-99 | Drill | Trio Consulting & Management,llc | Jul 9, 2015 | Jul 17, 2015 | Jul 30, 2015 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-281195 | — | — | — | — |
| — | — O-2-11181 | — | — | — | — |
| — | — O-2-11845 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 293 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,330 | 9,355 | Perforated |
| 9,371 | 9,376 | Perforated |
| 9,371 | 9,376 | Open hole |
| 9,382 | 9,392 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,715 | 12.25 | 515 S |
| 5.5 | 9,750 | 8.75 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 10, 2020 | Aug 19, 2019 | — |
| 00 | Nov 1, 2016 | Jun 15, 2016 | — |
| 00 | May 25, 2016 | Oct 12, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-285-33968 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-285-33968 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28533968, documented in the API reference.