WELL · 42-287-30335 · DISTRICT 3
Baldridge, P. #1
Lee County · Horizontal · Sidetrack
Baldridge, P. #1 (API 42-287-30335) is a permitted horizontal well in Lee County filed by Costilla Energy, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1978 and 1997, permitted to 15,000 ft.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 8, 1999
- Permits on file
- 173
- Phone
- (432) 683-3092
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Costilla Energy, Inc.through Sep 1997 |
| Latest permit | Costilla Energy, Inc.Mar 7, 1997 |
- 15,000
- total depth, ft
- 2
- permits on file
- Mar 7, 1997
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 245K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baldridge, Peggy G-3-124774 | Giddings (Austin Chalk, Gas) | Smith Brothers Oil & Gas, Inc. | 1 | 0 | 245K | Jan 1993 – Oct 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bridge Oil Company, L. P.Jan 1993 → Sep 1994
- 2Parker & Parsley Development L.POct 1994 → Jan 1995
- 3Parker & Parsley Producing L.P.Feb 1995 → May 1996
- 4Costilla Petroleum CorporationJun 1996 → Jan 1997
- 5Costilla Energy, Inc.Feb 1997 → Sep 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459611-99 | Recompletion · sidetrack | Costilla Energy, Inc. | Mar 7, 1997 | Mar 7, 1997 | — | 15,000 |
| 23053-99 | Drill | U. S. Resources, Inc. | Apr 27, 1978 | Apr 27, 1978 | — | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-124774 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 382 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 7,315 | -6,933 |
| Austin Chalk | 7,903 | -7,521 |
| Eagle FordEAGLEFORD | 8,565 | -8,183 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,902 | 7,972 | Perforated |
| 7,902 | 8,384 | Perforated |
| 8,016 | 8,094 | Perforated |
| 8,294 | 8,384 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 4,063 | 12.25 | 1,610 S |
| 2.375 | 7,830 | — | — |
| 5.5 | 8,424 | 7.875 | 365 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 2, 1987 | Jul 17, 1987 | — |
| 00 | Aug 13, 1987 | — | — |
| 00 | Jan 12, 1984 | Sep 11, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-30335 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-30335 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28730335, documented in the API reference.