TEXAS · WELLS · LEE COUNTY · BIGON LEASE · API 42-287-31324 · DISTRICT 03
Bigon #2
Lee County · Giddings (Austin Chalk-3) field · Vertical
Bigon #2 (API 42-287-31324) is a plugged well in Lee County, plugged July 15, 1996, last operated by Lynco Oilfield Equipment Inc..
The RRC has issued one drilling permit, issued November 19, 1982, permitted to 8,800 ft.
It was permitted by Santa FE - Windsor Producing CO. and has since transferred to Lynco Oilfield Equipment Inc. on the wellbore schedule.
Its lease has reported 2.01K barrels of oil and 33 mcf of gas since January 1993, last reporting in November 1996.
Operator of record
Permitted by Santa FE - Windsor Producing Co.; the EWA schedule now lists a different operator.
- Based in
- Giddings, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 29, 1999
- Phone
- (409) 542-1180
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Union Pacific Resources Company |
| Production reports | Stanton Mineral Development Incthrough May 1996 |
| Latest permit | Santa FE - Windsor Producing Co.Nov 19, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,800
- total depth, ft
- 1
- permits on file
- Nov 19, 1982
- last permit issued
- Jan 19, 1983
- completed
- 2.01K
- cumulative oil, bbl
- 33
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 19, 1983
- Shut in
- —
- Plugged
- Jul 15, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bigon O-3-19450 | Giddings (Austin Chalk-3) | Lynco Oilfield Equipment, Inc. | 1 | 2.01K | 33 | Jan 1993 – Nov 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bass PetroleumJan 1993 → May 1994
- 2Stanton Mineral Dev. Group, Inc.Jun 1994 → May 1995
- 3Stanton Mineral Development IncJul 1995 → May 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 180112-99 | Drill | Santa FE - Windsor Producing Co. | Nov 19, 1982 | Nov 19, 1982 | — | 8,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 19, 1983 | Bigon O-3-15774 | Giddings (Austin Chalk-3) | Union Pacific Resources Company | Plugged | — |
| Jan 19, 1983 | Bigon O-3-19450 | Giddings (Austin Chalk-3) | Lynco Oilfield Equipment Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,931 | 8,071 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,622 | 12.25 | 850 S |
| 2.375 | 7,864 | — | — |
| 5.5 | 8,316 | 8.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 1987 | Feb 11, 1982 | — |
| 00 | Dec 20, 1986 | — | — |
| 00 | Jan 12, 1984 | Feb 11, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-31324 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-31324 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28731324, documented in the API reference.