WELL · 42-287-31864 · DISTRICT 3
Sue Ann #1
Lee County · Nails Creek (Marlbrook) field · Vertical
Sue Ann #1 (API 42-287-31864) is a plugged well in Lee County, plugged August 4, 2009, last operated by Anadarko E&P Company LP.
The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 10,200 ft.
It was permitted by U. S. Operating, Inc. and has since transferred to Anadarko E&P Company LP on the wellbore schedule.
Completion filings report 4 formation tops, including Taylor, Pecan Gap, Austin Chalk, Eagle Ford.
Its lease has reported 480 barrels of oil and 10 mcf of gas since January 1993, last reporting in November 2009.
Operator of record
Permitted by U. S. Operating, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 27, 2012
- Permits on file
- 2,635
- Phone
- (832) 636-3130
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko E&P Company LP |
| Production reports | Anadarko E&P Company LPthrough Jun 2003 |
| Latest permit | U. S. Operating, Inc.Aug 25, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,200
- total depth, ft
- 2
- permits on file
- Aug 25, 1987
- last permit issued
- Aug 24, 1987
- completed
- 480
- cumulative oil, bbl
- 10
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 24, 1987
- Shut in
- —
- Plugged
- Aug 4, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sue Ann O-3-20399 | Nails Creek (Marlbrook) | Anadarko E&P Company LP | 1 | 480 | 10 | Jan 1993 – Nov 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1U. S. Operating, Inc.Feb 1993 → Jul 1994
- 2Union Pacific Resources CompanySep 1994 → Nov 1994
- 3Anadarko E&P Company LPJun 2003 → Jun 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 334905-99 | Recompletion | U. S. Operating, Inc. | Aug 21, 1987 | Aug 25, 1987 | — | 9,635 |
| 287533-99 | Drill | U. S. Operating, Inc. | Oct 11, 1985 | Oct 14, 1985 | Oct 31, 1985 | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-20399 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 352 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Taylor | 7,358 | -7,006 |
| Pecan Gap | 8,255 | -7,903 |
| Austin Chalk | 8,854 | -8,502 |
| Eagle FordEAGLEFORD | 9,534 | -9,182 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,358 | 7,366 | Perforated |
| 9,352 | 9,531 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,185 | 12.25 | 600 S |
| 5.5 | 9,635 | 8.75 | 365 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 12, 1989 | Mar 30, 1989 | Yes |
| 00 | Apr 7, 1989 | — | — |
| 00 | Jan 30, 1986 | Jan 10, 1986 | Yes |
| 00 | Jan 25, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-31864 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-31864 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28731864, documented in the API reference.