TEXAS · WELLS · LEE COUNTY · STEWART LEASE · API 42-287-31945 · DISTRICT 03

Stewart #1

Shut in

Lee County · Serbin (Taylor Sand) field · Producing  · Vertical

Stewart #1 (API 42-287-31945) is a well in Lee County operated by Trivista Operating LLC, completed August 6, 1986 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued July 8, 1986, permitted to 5,766 ft.

It was permitted by Tex-Lee Operating Company and has since transferred to Trivista Operating LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Navarro, Taylor.

Its lease has reported 18.7K barrels of oil and 22 mcf of gas since January 1993, last reporting volume in February 2026.

Operator of record

Trivista Operating LLC

Permitted by Tex-Lee Operating Company; the EWA schedule now lists a different operator.

Based in
Giddings, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 30, 2025
Permits on file
3
Phone
(979) 366-2700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrivista Operating LLC
Production reportsTrivista Operating LLCthrough Feb 2026
Latest permitTex-Lee Operating CompanyJul 8, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,766
total depth, ft
1
permits on file
Jul 8, 1986
last permit issued
Aug 6, 1986
completed
18.7K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 6, 1986
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stewart O-3-19352Serbin (Taylor Sand)Trivista Operating LLC118.7K22Jan 1993 – Feb 2026

Oil, barrels lease total

Last 12 months 511 · prior 12 514(-1%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1San Antonio Gas & Oil, Inc.Jan 1993 → Feb 2000
  2. 2Seay Oil & Gas, Ltd.Mar 2000 → Apr 2013
  3. 3Riley Exploration Opg Co, LLCMay 2013 → Jul 2017
  4. 4Trivista Operating LLCNov 2017 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
303919-99DrillTex-Lee Operating CompanyJul 7, 1986Jul 8, 1986Jul 20, 19865,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 6, 1986Stewart O-3-19352Serbin (Taylor Sand)Trivista Operating LLCProducing · shut in Aug 1, 20265,766

Formation tops

As filed on W-2/G-1. Subsea from 458 ft elevation.Download CSV →

FormationMD ftSubsea
NavarroNAVARRO A5,115-4,657
NavarroNAVARRO B5,220-4,762
TaylorTAYLOR SAND5,600-5,142

Perforations

Perforated and open-hole intervals.

FromToType
5,6625,676Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62559212.25350 S
4.55,7447.8751,235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 19, 1986Sep 12, 1986Yes
00Sep 18, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28731945, documented in the API reference.