TEXAS · WELLS · LEE COUNTY · KASPER LEASE · API 42-287-32029 · DISTRICT 03

Kasper #1

Plugged

Lee County · Serbin (Taylor Sand) field  · Vertical

Kasper #1 (API 42-287-32029) is a plugged well in Lee County, plugged October 15, 2019, last operated by Trivista Operating LLC.

The RRC has issued one drilling permit, issued February 5, 1987, permitted to 5,750 ft.

It was permitted by Weber Energy Corporation and has since transferred to Trivista Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Midway, Navarro, Taylor.

Its lease has reported 9.34K barrels of oil and 31.1K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Trivista Operating LLC

Permitted by Weber Energy Corporation; the EWA schedule now lists a different operator.

Based in
Giddings, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 30, 2025
Permits on file
3
Phone
(979) 366-2700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrivista Operating LLC
Production reportsTrivista Operating LLCthrough May 2015
Latest permitWeber Energy CorporationFeb 5, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,750
total depth, ft
1
permits on file
Feb 5, 1987
last permit issued
Mar 10, 1987
completed
9.34K
cumulative oil, bbl
31.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 10, 1987
Shut in
—
Plugged
Oct 15, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kasper O-3-19564Serbin (Taylor Sand)Trivista Operating LLC19.34K31.1KJan 1993 – May 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Weber Energy CorporationJan 1993 → Jun 1995
  2. 2Texas Vanguard Oil CompanyJul 1995 → Sep 2013
  3. 3Trivista Operating LLCNov 2013 → May 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
326141-99DrillWeber Energy CorporationFeb 4, 1987Feb 5, 1987—5,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 10, 1987Kasper O-3-19564Serbin (Taylor Sand)Trivista Operating LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 473 ft elevation.Download CSV →

FormationMD ftSubsea
MidwayMIDWAY SH4,188-3,715
NavarroNAVARRO SH4,854-4,381
NavarroNAVARRO SD4,951-4,478
TaylorTAYLOR SAND5,390-4,917

Perforations

Perforated and open-hole intervals.

FromToType
5,3925,432Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62562812.25400 S
4.55,5367.8751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 8, 1987Mar 23, 1987Yes
00Apr 1, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28732029, documented in the API reference.