WELL · 42-287-32249 · DISTRICT 3

Rost Unit #1RE

N

Lee County  · Horizontal · Directional · Sidetrack

Rost Unit #1RE (API 42-287-32249) is a permitted horizontal well in Lee County filed by Rme Petroleum Company; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended twice) between 1989 and 2001, permitted to 9,500 ft.

Completion filings report one formation top, including Austin Chalk.

Its 2 leases have reported 22.8K barrels of oil and 1.15M mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Rme Petroleum Company

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 19, 2002
Permits on file
512
Phone
(832) 601-3130

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMagnolia Oil & Gas Operating LLCthrough Apr 2026
Latest permitRme Petroleum CompanySep 6, 2001
9,500
total depth, ft
5
permits on file
Sep 6, 2001
last permit issued
—
completed
22.8K
cumulative oil, bbl
1.15M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rost Unit G-3-175091Giddings (Austin Chalk, Gas)Magnolia Oil & Gas Operating LLC10618KNov 1999 – Jul 2026
Rost Unit O-3-20553Giddings (Austin Chalk-3)Union Pacific Resources Company122.8K535KJan 1993 – Aug 2000

Gas, mcf lease total

Last 12 months 482 · prior 12 331(+46%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1U. S. Operating, Inc.Jan 1993 → Jul 1994
  2. 2Union Pacific Resources CompanyAug 1994 → Jan 2001
  3. 3Rme Petroleum CompanyFeb 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Jul 2007
  5. 5Enervest Operating, L.L.C.Aug 2007 → Jul 2018
  6. 6Magnolia Oil & Gas Operating LLCAug 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513382-98Recompletion · sidetrackRme Petroleum CompanyJun 12, 2002Sep 6, 2001—8,900
513382-99Recompletion · sidetrackRme Petroleum CompanySep 6, 2001Sep 6, 2001—9,400
467964-99Recompletion · sidetrackUnion Pacific Resources CompanySep 24, 1997Sep 24, 1997Oct 16, 19978,850
357898-98DrillU. S. Operating, Inc.Sep 13, 1989Apr 11, 1989—9,500
357898-99DrillU. S. Operating, Inc.Apr 7, 1989Apr 11, 1989—9,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-175091————
—— O-3-20553————

Formation tops

As filed on W-2/G-1. Subsea from 339 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk8,170-7,831
Austin Chalk8,497-8,158

Perforations

Perforated and open-hole intervals.

FromToType
8,49711,565Perforated
8,5078,775Perforated
8,6188,898Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,24412.25380 S
77,5818.75150 S
77,5898.75150 S
7—8.75940 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 2000Nov 23, 1999—
00Dec 15, 1999——
00Jan 28, 1998Dec 12, 1997Yes
00Nov 8, 1989Sep 28, 1989Yes
00Oct 25, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28732249, documented in the API reference.