TEXAS · WELLS · LEE COUNTY · PLACKE UNIT LEASE · API 42-287-32429 · DISTRICT 03
Placke Unit #1
Lee County · Giddings (Austin Chalk-3) field · Horizontal
Placke Unit #1 (API 42-287-32429) is a plugged horizontal well in Lee County, plugged July 22, 2003, last operated by Anadarko E&P Company LP.
The RRC has issued one drilling permit, issued May 23, 1994, permitted to 9,600 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Anadarko E&P Company LP on the wellbore schedule.
Completion filings report 5 formation tops, including Navarro, Taylor, Pecan Gap, Austin Chalk.
Its lease has reported 65.9K barrels of oil and 97.7K mcf of gas since September 1994, last reporting in September 2003.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Sep 27, 2012
- Permits on file
- 2,635
- Phone
- (832) 636-3130
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko E&P Company LP |
| Production reports | Union Pacific Resources Companythrough Mar 1999 |
| Latest permit | Union Pacific Resources CompanyMay 23, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,600
- total depth, ft
- 1
- permits on file
- May 23, 1994
- last permit issued
- Sep 4, 1994
- completed
- 65.9K
- cumulative oil, bbl
- 97.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Sep 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 4, 1994
- Shut in
- —
- Plugged
- Jul 22, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Placke Unit O-3-22539 | Giddings (Austin Chalk-3) | Anadarko E&P Company LP | 1 | 65.9K | 97.7K | Sep 1994 – Sep 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Pacific Resources CompanySep 1994 → Mar 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 424037-99 | Drill | Union Pacific Resources Company | May 18, 1994 | May 23, 1994 | Aug 3, 1994 | 9,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 4, 1994 | Placke Unit O-3-22539 | Giddings (Austin Chalk-3) | Anadarko E&P Company LP | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 453 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 6,351 | -5,898 |
| Taylor | 6,951 | -6,498 |
| Pecan Gap | 7,831 | -7,378 |
| Austin Chalk | 8,281 | -7,828 |
| Eagle FordEAGLEFORD | 9,061 | -8,608 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,374 | 12,970 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,530 | 14.75 | 410 S |
| 7.625 | — | 9.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 18, 1994 | Oct 11, 1994 | Yes |
| 00 | Oct 31, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-32429 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-32429 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28732429, documented in the API reference.