WELL · 42-287-32534 · DISTRICT 3
Hammerhead #1
Lee County · Giddings (North Edwards) field · Vertical
Hammerhead #1 (API 42-287-32534) is a plugged well in Lee County, plugged December 14, 2016, last operated by SM Energy Company.
The RRC has issued 2 drilling permits (amended once) between 2006 and 2014, permitted to 10,500 ft.
Completion filings report 5 formation tops, including Wilcox, Taylor, Pecan Gap, Austin Chalk.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 3, 2025
- Permits on file
- 2,485
- Phone
- (303) 861-8140
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | SM Energy Company |
| Production reports | Chaparral Energy, L.L.C.through Feb 2009 |
| Latest permit | SM Energy CompanyOct 22, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 3
- permits on file
- Oct 22, 2014
- last permit issued
- Jan 11, 2007
- completed
- 0
- cumulative oil, bbl
- 1.22K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Dec 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 11, 2007
- Shut in
- —
- Plugged
- Dec 14, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hammerhead G-3-226616 | Giddings (North Edwards) | SM Energy Company | 1 | 0 | 1.22K | Jan 2007 – Dec 2016 |
| Hammerhead O-3-27080 | Giddings (Austin Chalk-3) | SM Energy Company | 1 | 0 | 0 | Jul 2014 – Dec 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chaparral Energy, L.L.C.Jan 2007 → Feb 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 798571-98 | Recompletion | SM Energy Company | Nov 17, 2014 | Oct 22, 2014 | Oct 9, 2013 | 10,500 |
| 798571-99 | Recompletion | SM Energy Company | Oct 17, 2014 | Oct 22, 2014 | — | 10,500 |
| 614189-99 | Drill | Chaparral Energy, L.L.C. | Feb 14, 2006 | Feb 14, 2006 | Mar 16, 2006 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-226616 | — | — | — | — |
| — | — O-3-27080 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 398 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,001 | 9,133 | Perforated |
| 10,042 | 10,052 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 377 | 12.25 | 1,300 S |
| 9.625 | 3,777 | 12.25 | 1,300 S |
| 9.625 | 4,553 | 12.25 | 1,483 S |
| 5.5 | 10,344 | 8.75 | 540 S |
| 5.5 | 14,720 | 8.75 | 1,612 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 5, 2017 | Oct 18, 2016 | — |
| 00 | Aug 1, 2016 | Jul 10, 2015 | — |
| 00 | Jul 29, 2016 | Mar 20, 2014 | — |
| 00 | May 23, 2007 | Apr 23, 2007 | Yes |
| 00 | May 16, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-287-32534 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-287-32534 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/28732534, documented in the API reference.