WELL · 42-287-32626 · DISTRICT 3

McCowan Unit #1H

Y

Lee County · Southern Bay (Eagle Ford) field · Producing  · Horizontal

Mccowan Unit #1H (API 42-287-32626) is a horizontal well in Lee County operated by Eog Resources Inc., completed December 20, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 28, 2014, permitted to 7,439 ft.

It was permitted by Venado Oil & Gas, LLC and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Pecan Gap, Eagle Ford, Wilcox.

Its lease has reported 483K barrels of oil and 231K mcf of gas since May 2014, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Permitted by Venado Oil & Gas, LLC; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsCrescent Pass Energy, LLCthrough Apr 2026
Latest permitVenado Oil & Gas, LLCFeb 28, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,439
total depth, ft
1
permits on file
Feb 28, 2014
last permit issued
Dec 20, 2024
completed
483K
cumulative oil, bbl
231K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 20, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McCowan Unit O-3-26661Southern Bay (Eagle Ford)EOG Resources, Inc.2483K231KMay 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 80,362 · prior 12 89,758(-10%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 17,960 · prior 12 26,801(-33%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Venado Oil & Gas, LLCMay 2014 → Oct 2016
  2. 2Petrolegacy Energy I, LLCNov 2016 → Aug 2017
  3. 3Armor Lonestar, LLCSep 2017 → Jul 2021
  4. 4Crescent Pass Energy, LLCAug 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
778919-99DrillVenado Oil & Gas, LLCFeb 4, 2014Feb 28, 2014Apr 6, 201416,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 20, 2024McCowan Unit O-3-26661Southern Bay (Eagle Ford)EOG Resources Inc.Producing7,439

Formation tops

As filed on W-2/G-1. Subsea from 381 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap6,367-5,986
Eagle Ford7,535-7,154
WilcoxWILCOX - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
7,94514,233Perforated
7,96714,292Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,17112.251,160 S
5.514,3428.51,560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 27, 2025Apr 7, 2025—
00Jun 17, 2015Jul 25, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28732626, documented in the API reference.