WELL · 42-289-30548 · DISTRICT 5

Parks "C" #1

N

Leon County  · Directional · Sidetrack

Parks "C" #1 (API 42-289-30548) is a permitted well in Leon County filed by Mariah Energy Corp.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1983 and 1993, permitted to 16,500 ft.

Completion filings report 9 formation tops, including Bac, Austin Chalk, Glen Rose, Base Mass. Anhyd..

Operator of record

Mariah Energy Corp.

Based in
Austin, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 4, 1998
Permits on file
106
Phone
(512) 327-2620

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsBRG Lone Star Ltd.through Apr 2023
Latest permitMariah Energy Corp.Sep 1, 1993
16,500
total depth, ft
5
permits on file
Sep 1, 1993
last permit issued
—
completed
0
cumulative oil, bbl
373K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christian G-5-146479Bear Grass (Travis Peak)Atlas Operating LLC10373KJan 1993 – Jul 2026
— G-5-120350——000—
— G-5-146386——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mariah Energy Corp.Sep 1993 → Jun 1996
  2. 2T&H Operating Company, L.L.C.Jul 1996 → Jun 2002
  3. 3BRG Petroleum, Inc.Aug 1996 → Jun 1998
  4. 4Seagull Energy E&P Inc.Jul 1998 → Jun 2000
  5. 5Classic Oil & Gas, Inc.Jul 2000 → Aug 2000
  6. 6Map Production Co., Inc.Jul 2002 → Aug 2002
  7. 7Buffco Production Inc.Nov 2002 → Jul 2007
  8. 8BRG Lone Star Ltd.Aug 2007 → Apr 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
415322-99RecompletionMariah Energy Corp.Aug 24, 1993Sep 1, 1993Sep 30, 199210,000
388956-99Recompletion · sidetrackMariah Energy Corp.Jun 13, 1991Sep 5, 1991Mar 7, 199216,000
299340-99RecompletionTXO Production Corp.Jan 23, 1986Mar 3, 1986—16,020
291757-99RecompletionTXO Production Corp.Dec 4, 1985Dec 4, 1985—16,020
190419-99DrillTXO Production Corp.Mar 31, 1983Mar 31, 1983Apr 23, 198316,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-120350————
—— G-5-146386————
—— G-5-146479————

Formation tops

As filed on W-2/G-1. Subsea from 447 ft elevation.Download CSV →

FormationMD ftSubsea
Bac5,042-4,595
Austin ChalkBASE AUSTIN CHALK5,043-4,596
Glen Rose7,105-6,658
Base Mass. Anhyd.8,345-7,898
BMA8,345-7,898
James LimeJAMES8,888-8,441
Pettit9,050-8,603
Bossier13,595-13,148
BossierBOSSIER SHALE13,595-13,148
Cotton ValleyCOTTON VALLEY LIME15,335-14,888

Perforations

Perforated and open-hole intervals.

FromToType
9,6329,652Perforated
10,42310,550Perforated
12,68012,690Perforated
15,38815,400Perforated
15,41015,414Perforated
15,41915,426Perforated
15,45215,456Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1663201,350 S
9.6255,90012.5875 S
713,6508.751,675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 20, 1993Oct 30, 1992Yes
00Sep 15, 1993——
00Sep 9, 1993——
00Apr 3, 1986Jan 27, 1986Yes
00Mar 25, 1986——
00Feb 22, 1984Jan 23, 1984Yes
00Feb 7, 1984Jan 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28930548, documented in the API reference.