WELL · 42-289-30911 · DISTRICT 5

Sherman-Wakefield #1

Plugged

Leon County · Alabama Ferry (Glenrose D West) field  · Vertical

Sherman-Wakefield #1 (API 42-289-30911) is a plugged well in Leon County, plugged October 3, 2019, last operated by Prime Operating Company.

The RRC has issued one drilling permit (amended once), issued June 15, 1987, permitted to 11,200 ft.

It was permitted by Global Natural Resources Corp. and has since transferred to Prime Operating Company on the wellbore schedule.

Completion filings report 7 formation tops, including Austin Chalk, Sub-Clarksville, Osr Sand, Dexter.

Its 2 leases have reported 14.3K barrels of oil and 245K mcf of gas since January 1993, last reporting in April 2020. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Prime Operating Company

Permitted by Global Natural Resources Corp.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
595
Phone
(432) 682-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePrime Operating Company
Production reportsPrime Operating Companythrough Oct 2015
Latest permitGlobal Natural Resources Corp.Jun 15, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,200
total depth, ft
2
permits on file
Jun 15, 1987
last permit issued
—
completed
14.3K
cumulative oil, bbl
245K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 3, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sherman-Wakefield O-5-3670Alabama Ferry (Glenrose D, West)Prime Operating Company114.3K120KJun 1999 – Apr 2020
Sherman-Wakefield G-5-128299Alabama Ferry (Glenrose D, West)Prime Operating Company10125KJan 1993 – Nov 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Prime Operating CompanyJan 1993 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
331446-98DrillGlobal Natural Resources Corp.Jun 25, 1987Jun 15, 1987Jul 6, 198711,200
331446-99DrillGlobal Natural Resources Corp.Jun 10, 1987Jun 15, 1987—9,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-5-128299————
—— O-5-3670————

Formation tops

As filed on W-2/G-1. Subsea from 328 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,622-6,294
Sub-ClarksvilleSUB CLARKSVILLE6,652-6,324
Sub-Clarksville6,652-6,324
Osr Sand6,864-6,536
Dexter7,226-6,898
Dexter (Buda)7,508-7,180
Paluxy8,504-8,176
Glen RoseGLENROSE8,720-8,392
Glen RoseGLENROSE D9,137-8,809

Perforations

Perforated and open-hole intervals.

FromToType
9,1379,145Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,59511945 S
5.57,4507.875485 S
5.59,5167.875130 S
5.5——130 S
5.5—7.875485 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 9, 1999Jul 29, 1999—
00Aug 25, 1999——
00Oct 13, 1988Aug 26, 1988—
00Sep 16, 1988——
00Nov 18, 1987Sep 23, 1987Yes
00Nov 16, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28930911, documented in the API reference.