TEXAS · WELLS · LEON COUNTY · API 42-289-31854 · DISTRICT 05

Gail King #38

Y

Leon County · Bear Grass (Pettit) field · SWR-10-Well  · Vertical

Gail King #38 (API 42-289-31854) is a well in Leon County operated by Hilcorp Energy Company, completed June 29, 2010 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 13, 2010, permitted to 11,592 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitXTO Energy Inc.Jan 13, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,592
total depth, ft
2
permits on file
Jan 13, 2010
last permit issued
Jun 29, 2010
completed
0
cumulative oil, bbl
265K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 29, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gail King G-5-257629Bear Grass (Travis Peak)Hilcorp Energy Company10265KJun 2010 – Jul 2026
Gail King G-5-257630Bear Grass (Pettit)Hilcorp Energy Company100Jun 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 3,029 · prior 12 1,605(+89%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jun 2010 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
689381-98DrillXTO Energy Inc.May 14, 2010Jan 13, 2010Apr 20, 201012,000
689381-99DrillXTO Energy Inc.Jan 6, 2010Jan 13, 2010Apr 20, 201012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 29, 2010Gail King G-5-257630Bear Grass (Pettit)Hilcorp Energy CompanySWR-10-Well · shut in Aug 1, 201011,592
Jun 29, 2010Gail King G-5-257629Bear Grass (Travis Peak)Hilcorp Energy CompanyProducing11,592

Formation tops

As filed on W-2/G-1. Subsea from 472 ft elevation.Download CSV →

FormationMD ftSubsea
BMA8,116-7,644
Pettit8,870-8,398
Travis Peak9,155-8,683
Cotton ValleyCOTTON VALLEY CONS.11,423-10,951

Perforations

Perforated and open-hole intervals.

FromToType
8,9699,128Perforated
9,27810,205Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,55511324 S
5.511,5928.75827 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2011Aug 30, 2010Yes
00Oct 11, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/28931854, documented in the API reference.